Shunde College Railway Station (Foshan Metro)

Shunde College Railway Station

顺德学院站
Platform
Chinese name
Simplified Chinese顺德学院站
Traditional Chinese順德學院站
Transcriptions
Standard Mandarin
Hanyu PinyinShùndé Xuéyuàn Zhàn
Yue: Cantonese
Yale RomanizationSeuhndāk Hohkyún Jaahm
JyutpingSeon6 dak1 hok6 jyun2 Zaam6
General information
LocationLongpan North Road (龙盘北路), Daliang Subdistrict
Shunde District, Foshan, Guangdong
China
Coordinates22°49′17.83″N 113°18′46.4″E / 22.8216194°N 113.312889°E / 22.8216194; 113.312889
Operated byFoshan Metro Operation Co., Ltd.
Lines     Line 3
South section
Platforms2 (1 island platform)
Tracks2
Connections Shundexueyuan railway station
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeF302
History
Opened28 December 2022 (2022-12-28)
Services
Preceding station Foshan Metro Following station
Shunde OCT Harbour PLUS Line 3
South section
Terminus
Transfer at Shunde Polytechnic
Preceding station Pearl River Delta Metropolitan Region Intercity Railway Following station
Shunde Guangzhou–Zhuhai intercity railway
transfer at Shunde Polytechnic
Ronggui
towards Zhuhai
Future services
Preceding station Foshan Metro Following station
Future services
Shunde OCT Harbour PLUS Line 3
South section
Shunde Port
Terminus
Location

Shunde College Railway Station (simplified Chinese: 顺德学院站; traditional Chinese: 順德學院站; pinyin: Shùndé Xuéyuàn Zhàn; Cantonese Yale: Seuhndāk Hohkyún Jaahm; lit. 'Shunde Polytechnic railway station') is a station on Line 3 of Foshan Metro, located in Foshan's Shunde District.[1] It opened on 28 December 2022, and is the southern terminus of the line.[2][3] It is also both the southernmost and easternmost station of the Foshan Metro.

Station layout

The station has an underground island platform near Longpan North Road.[4]

G - Exits A & C
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 1  3  towards Zhongshan Park (Shunde OCT Harbour PLUS)
Island platform, doors will open on the left
Platform 2  3  termination platform

Entrances/exits

The station has 2 points of entry/exit, lettered A and C. Both are accessible via elevators. In the future, Exits B and D will be implemented.[1][4]

  • A: Longpan North Road
  • C: Longpan North Road

History

Line 3 did not have this station when it was approved in 2012.[5] In 2015, Line 3 changed its planned alignment, adding this station to connect to the Guangzhou–Zhuhai intercity railway and named Shunde College station.[6] The relevant adjustment plan was approved by the Guangdong Provincial Development and Reform Commission in March 2019.[7] In 2022, the station was renamed to Shunde but was later adjusted to Shunde College Railway Station before the opening of Line 3 because the name was easily confused with the intercity railway station of the same name, which is more than 7 kilometers away.[8][9]

On 21 October 2020, the main structure of the first phase of the station was topped out.[10] On 31 July 2022, the station passed the project acceptance.[11] On 28 December the same year, the station opened with the opening of Line 3.[12]

Future development

After the opening of the rear section in the future, Line 3 will be extended to Shunde Port station, and the station will become an intermediate station, where platform 2 will be used in the direction of Shunde Port.

In the future, Line 26 of Guangzhou Metro will also pass through the station, and it will become a transfer station.

References

  1. ^ a b "顺德学院站" [Shunde College Railway Station]. Foshan Metro (in Simplified Chinese). Foshan Metro.
  2. ^ 北青网 (28 December 2022). "广东佛山地铁3号线首通段正式开通运营" [The first section of Guangdong Foshan Metro Line 3 officially opened for operation] (in Simplified Chinese). Retrieved 21 July 2024.
  3. ^ "Foshan opens metro Line 3". Metro Report International. 29 December 2022. Archived from the original on 8 May 2024. Retrieved 21 July 2024.
  4. ^ a b 梁焯贤 (28 December 2019). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 26 June 2022 – via Foshan Municipal People's Government.
  5. ^ 李传智 (7 June 2013). "地铁三号线工程环评第二次公告发布:三号线将与7条地铁线换乘" [Second Announcement of Environmental Impact Assessment for Metro Line 3 Project Released: Line 3 Will Interchange with Seven Metro Lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 25 July 2022. Retrieved 17 September 2025 – via Sina News.
  6. ^ "不到容桂 3号线走向有变" [Line 3's route has changed before reaching Ronggui]. Guangzhou Daily (in Simplified Chinese). 20 July 2016. Archived from the original on 19 August 2022 – via Shunde Library.
  7. ^ "广东省发展改革委关于佛山市城市轨道交通三号线工程可行性研究调整报告的批复" [Guangdong Provincial Development and Reform Commission's reply on the adjustment report on the feasibility study of Foshan Urban Rail Transit Line 3 Project] (in Simplified Chinese). Guangdong Provincial Development and Reform Commission. 29 March 2019. Archived from the original on 15 June 2022. Retrieved 17 September 2025.
  8. ^ "佛山地铁3号线站名" [Foshan Metro Line 3 station names]. People's Daily Leaders Message Board (in Simplified Chinese). 15 July 2022. Archived from the original on 26 July 2022. Retrieved 17 September 2025.
  9. ^ "惊艳亮相!发布君试乘地铁3号线,预计通车时间→" [Stunning appearance! Releaser takes a test ride on Metro Line 3, estimated opening time →]. Foshan News Network (in Simplified Chinese). 18 August 2022. Archived from the original on 19 August 2022. Retrieved 17 September 2025 – via "Foshan Release" Official WeChat Account.
  10. ^ "最新进展!佛山地铁2号线首批车站顺利入驻,3号线完成关键节点目标" [Latest progress! The first batch of stations on Foshan Metro Line 2 have been successfully occupied, and Line 3 has completed key milestones.]. Foshan Rail Transit Bureau (in Simplified Chinese). 21 October 2020. Archived from the original on 19 August 2022. Retrieved 17 September 2025.
  11. ^ "佛山市城市轨道交通三号线工程3202-4标段子单位工程顺利通过验收" [The 3202-4 section of Foshan Urban Rail Transit Line 3 project has successfully passed the acceptance inspection]. China Communications Construction Co., Ltd. (in Simplified Chinese). 31 July 2022. Archived from the original on 31 July 2022. Retrieved 17 September 2025 – via Official WeChat Account of "CCCC Foshan Metro Project".
  12. ^ 陈飞龙 (24 December 2022). "官宣!佛山地铁3号线首通段12月28日正式开通" [Official Announcement! The first section of Foshan Metro Line 3 officially opened on December 28th] (in Simplified Chinese). Southern Metropolis Daily. Archived from the original on 24 December 2022. Retrieved 17 September 2025.