Licun station (Foshan Metro)

Licun

荔村
Platform
Chinese name
Chinese荔村站
Transcriptions
Standard Mandarin
Hanyu PinyinLìcūn Zhàn
Yue: Cantonese
Yale RomanizationLaihchyūn Jaahm
JyutpingLai6cyun1 Zaam6
General information
LocationIntersection of Yangda Road (羊大路) and Yucheng Road (裕成路), Lunjiao Subdistrict
Shunde District, Foshan, Guangdong
China
Coordinates22°52′29.75″N 113°13′32.16″E / 22.8749306°N 113.2256000°E / 22.8749306; 113.2256000
Operated byFoshan Metro Operation Co., Ltd.
Lines     Line 3
South section
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeF310
History
Opened28 December 2022 (2022-12-28)
Services
Preceding station Foshan Metro Following station
Lunjiao Line 3
South section
The First People's Hospital of Shunde
Location

Licun station (Chinese: 荔村站; pinyin: Lìcūn Zhàn; Cantonese Yale: Laihchyūn Jaahm) is a station on Line 3 of Foshan Metro, located in Foshan's Shunde District.[1] It opened on 28 December 2022.[2][3]

Station layout

The station has an island platform under Yangda Road.[4]

G - Exits A & C
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 1  3  towards Zhongshan Park (Lunjiao)
Island platform, doors will open on the left
Platform 2  3  towards Shunde College Railway Station (The First People's Hospital of Shunde)

Exits

The station has 2 points of entry/exit, located on the northwest and southwest sides of the intersection of Yangda Road and Yucheng Road. Exit A is accessible via elevator.[1]

  • A: Yucheng Road
  • C: Yucheng Road

History

The station started enclosure construction on 4 March 2017.[5] The base slab was sealed on 4 July 2019,[6] and the station topped out on 7 October the same year.[7] On 16 September 2019, the left line tunnel between this station and Shunde Hospital (now The First People's Hospital of Shunde) station broke through.[8] On 9 July 2020, the double line tunnel between this station and Lunjiao station broke through.[9]

On 30 May 2022, the station completed the "three rights" transfer.[10] On 28 December the same year, the station opened with the opening of Line 3.[11]

References

  1. ^ a b "荔村" [Licun]. Foshan Metro (in Simplified Chinese). Foshan Metro.
  2. ^ 北青网 (28 December 2022). "广东佛山地铁3号线首通段正式开通运营" [The first section of Guangdong Foshan Metro Line 3 officially opened for operation] (in Simplified Chinese). Retrieved 21 July 2024.
  3. ^ "Foshan opens metro Line 3". Metro Report International. 29 December 2022. Archived from the original on 8 May 2024. Retrieved 21 July 2024.
  4. ^ 梁焯贤 (28 December 2019). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 26 June 2022 – via Foshan Municipal People's Government.
  5. ^ "顺德地铁施工最新进展!这些道路封闭,注意绕行" [Shunde Metro construction progress! These roads are closed, please take detours]. Foshan Online (in Simplified Chinese). 17 March 2017. Archived from the original on 26 June 2022.
  6. ^ "三号线|荔村站、新松站取得节点性突破" [Line 3 - Licun Station and Xinsong Station achieved a key breakthrough]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 10 July 2019. Archived from the original on 19 June 2022. Retrieved 19 September 2025 – via Foshan Metro Official WeChat Account.
  7. ^ "佛山地铁三号线工程荔村站主体结构顺利封顶" [The main structure of Licun Station on Foshan Metro Line 3 has been successfully topped out]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 11 October 2019. Archived from the original on 22 October 2019. Retrieved 19 September 2025.
  8. ^ "三号线|顺德伦教段"顺-荔"区间左线盾构贯通" [Line 3 - Shunde-Lunjiao section "Shun-Li" section left line shield tunnel penetrates]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 20 September 2019. Archived from the original on 19 June 2022. Retrieved 19 September 2025 – via Foshan Metro Official WeChat Account.
  9. ^ "三号线|荔村站-伦教站盾构区间双线贯通" [Line 3 - Double-track tunnel section between Licun Station and Lunjiao Station completed]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 17 July 2020. Archived from the original on 19 June 2022. Retrieved 19 September 2025 – via Foshan Metro Official WeChat Account.
  10. ^ "3号线首批5个车站顺利完成临时"三权"移交" [The first batch of 5 stations on Line 3 successfully completed the temporary "three rights" transfer]. Foshan State-owned Assets Supervision and Administration Commission (in Simplified Chinese). 8 June 2022. Archived from the original on 16 July 2022. Retrieved 19 September 2025.
  11. ^ 陈飞龙 (24 December 2022). "官宣!佛山地铁3号线首通段12月28日正式开通" [Official Announcement! The first section of Foshan Metro Line 3 officially opened on December 28th] (in Simplified Chinese). Southern Metropolis Daily. Archived from the original on 24 December 2022. Retrieved 19 September 2025.