Shenjing station (Guangzhou Metro)

Shenjing

深井
Platform
Chinese name
Chinese深井站
Transcriptions
Standard Mandarin
Hanyu PinyinShēnjǐng Zhàn
Yue: Cantonese
Yale RomanizationSāmjéng Jaahm
JyutpingSam1zeng2 Zaam6
General information
LocationShenjing Village, Jinzhou South Road (金洲南路) within Changzhou Island
Changzhou Subdistrict, Huangpu District, Guangzhou, Guangdong
China
Coordinates23°4′15.64″N 113°24′13.75″E / 23.0710111°N 113.4038194°E / 23.0710111; 113.4038194
Operated byGuangzhou Metro Co. Ltd.
Line     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code710
History
Opened28 December 2023 (2023-12-28)
Services
Preceding station Guangzhou Metro Following station
Higher Education Mega Center South
towards Meidi Dadao
Line 7 Changzhou
towards Yanshan
Transfer at Shenjing
Preceding station Pearl River Delta Metropolitan Region Intercity Railway Following station
Pazhou
Terminus
Pazhou–Lianhuashan intercity railway
transfer at Shenjing
Hualong South
Location

Shenjing Station (Chinese: 深井站; pinyin: Shēnjǐng Zhàn; Cantonese Yale: Sāmjéng Jaahm) is a station of Guangzhou Metro Line 7, located underground at Jinzhou South Road within Shenjing Village on Changzhou Island in Guangzhou's Huangpu District.[1] The station opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

It is the station on the Phase 2 extension that takes up the most land area.[3]

Station layout

G Street level Exits A, C, D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
- Transfer to  PL 
L2
Platforms
Platform 2  7  towards Meidi Dadao (Higher Education Mega Center South)
Island platform, doors will open on the left (Toilets, Nursery)
Platform 1  7  towards Yanshan (Changzhou)

Entrances/exits

The station has 3 points of entry/exit, with Exit C being accessible via elevator.[4] Next to Exit A, there is also a transfer passage connecting to Shenjing railway station.[5]

  • A: Jinzhou South Road, Guangdong Provincial Workers' Hospital
  • C: Jinzhou South Road
  • D: Jinzhou South Road, Guangdong Museum of Traditional Chinese Medicine

History

In February 2022, the main structure of the site topped out.[6] In August the same year, the right line tunnel boring machine between the Higher Education Mega Center South middle wind shaft and the station broke through, marking the realization of a double-line breakthrough in the tunnel between the station and Higher Education Mega Center South Station.[7] The station completed the "three rights" transfer in October 2023.[8] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]

References

  1. ^ "黄埔南北大动脉!空中俯瞰地铁7号线二期各站点建设情况,这座车站已封顶……" [Huangpu's north-south artery! An aerial view of the construction progress of various stations on Metro Line 7 Phase II. This station has been topped out...]. Guangzhou Huangpu Release (in Simplified Chinese). 28 July 2021. Archived from the original on 22 January 2023 – via Official WeChat Account.
  2. ^ a b "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通" [Guangzhou Metro Line 7 Phase II and Line 5 East Extension opened for operation, and Changzhou Island sent out lion dance to welcome the opening]. New Express Daily (in Simplified Chinese). 28 December 2023. Archived from the original on 28 December 2023. Retrieved 5 January 2024.
  3. ^ "广州地铁七号线二期将于今年年底开通,深井站机电安装冲刺中!" [The second phase of Guangzhou Metro Line 7 will be opened at the end of this year, and the mechanical and electrical installation of Shenjing Station is in the final stages!]. Yangcheng Evening News (in Simplified Chinese). 27 April 2023. Archived from the original on 27 April 2023. Retrieved 5 January 2024.
  4. ^ "深井". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
  5. ^ 杜娟 (2 June 2018). "穗莞深城际琶洲支线开始环评公示" [The environmental impact assessment of the Guangzhou-Shenzhen-Dongguan intercity Pazhou branch line has been made public]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 22 January 2023 – via Sina News.
  6. ^ 李天研 (15 February 2022). "进度条再更新!广州地铁七号线二期、十号线又有车站封顶" [Progress bar updated again! Guangzhou Metro Line 7 Phase 2 and Line 10 have another station capped]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 22 January 2023.
  7. ^ ""贯通+封顶"七号线二期完成两目标" ["Through-connected + capped" Phase 2 of Line 7 achieves two goals]. Guangzhou Metro (in Simplified Chinese). 15 August 2022. Archived from the original on 22 January 2023.
  8. ^ "决战决胜四季度丨转交"金钥匙",中铁北京局承建的广州地铁七号线二期车站完成"三权移交"" [Decisive battle for victory in the fourth quarter丨Handing over the "golden key", the second phase of Guangzhou Metro Line 7 station constructed by China Railway Beijing Engineering Bureau completed the "three rights transfer"]. China Railway Beijing Engineering Bureau No. 2 Company (in Simplified Chinese). 28 December 2023. Archived from the original on 6 November 2023. Retrieved 5 January 2024.