Guangzhou Lianhuashan railway station
Exterior | ||||||||||||||||
| Chinese name | ||||||||||||||||
| Simplified Chinese | 广州莲花山站 | |||||||||||||||
| Traditional Chinese | 廣州蓮花山站 | |||||||||||||||
| ||||||||||||||||
| General information | ||||||||||||||||
| Location | Lianhua Road (莲花路) Shilou, Panyu District, Guangzhou, Guangdong China | |||||||||||||||
| Coordinates | 23°0′17.78″N 113°29′12.77″E / 23.0049389°N 113.4868806°E | |||||||||||||||
| Owned by | Pearl River Delta Metropolitan Region intercity railway | |||||||||||||||
| Operated by | Guangdong Intercity Railway Operation Co., Ltd. | |||||||||||||||
| Lines |
| |||||||||||||||
| Platforms | 6 (2 island platforms and 2 side platforms) | |||||||||||||||
| Tracks | 6 | |||||||||||||||
| Connections | 8 (future) | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | At-grade | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | GLA (Pinyin: GZS) | |||||||||||||||
| History | ||||||||||||||||
| Opened |
| |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Guangzhou Lianhuashan railway station (simplified Chinese: 广州莲花山站; traditional Chinese: 廣州蓮花山站; pinyin: Guǎngzhōu Liánhuāshān Zhàn; Cantonese Yale: Gwóngjāu Lìhnfāsāan Jaahm; lit. 'Guangzhou Lotus Hill station') is a station on Guangzhou–Huizhou intercity railway and Pazhou branch of the Guangzhou–Shenzhen intercity railway located in Panyu District, Guangzhou, Guangdong, China.[1][2] It opened on 26 May 2024.[3][4][5]
Features
The station has 2 at-grade island platforms and 2 side platforms, and the station design incorporates lotus elements.[6]
Layout
| G | Side platform | |
| Platform 6 | Reserved platform | |
| Platform 5 | GH towards Dongguan West or Huizhou North (Machong) | |
| Island platform, doors will open on the left or right | ||
| Platform 4 | GH towards Dongguan West or Huizhou North (Machong) | |
| Platform 3 | GH towards Panyu, Foshan West or Zhaoqing (Guanqiao North) | |
| Island platform, doors will open on the left or right | ||
| Platform 2 | PL towards Pazhou and Huadu (Hualong South) | |
| Platform 1 | Reserved platform | |
| Side platform | ||
| Concourse, Entrances/Exits | Entrance, Ticket Office, Waiting Area, Exit | |
| B1 | Connecting passage | Towards concourse and platforms |
History
The station was originally called Lianhua station, but was changed to Guangzhou Lianhuashan station on 26 November 2020.[1] On 30 November the same year, the station topped out.[6]
Future development
The planned eastern extension of Guangzhou Metro Line 8 will have Lianhua station on the southeast side of the station. When it is constructed, a new transfer channel will be built to connect the station platform and the station building.[7]
Gallery
-
Aerial view of the station
-
Concourse
-
Entrance
-
Exit
References
- ^ a b "广东省交通运输厅关于佛莞城际广州南站至望洪站段车站站名命名方案的批复" (PDF). 26 November 2020.
- ^ 王汉文 (23 November 2022). "佛莞城际铁路广州莲花山站露芳容" [Guangzhou Lianhuashan Station of Foshan-Dongguan Intercity Railway unveiled]. Panyu District Media Integration Center (in Simplified Chinese). Archived from the original on 16 May 2024. Retrieved 4 August 2024 – via Southern Network.
- ^ 覃征鹏 (26 May 2024). ""四线贯通 真的好兴奋"!全国最长跨市"地铁"通车见闻" ["Four lines connected, so exciting!" Insights on the opening of the country's longest cross-city "subway"]. Foshan Daily (in Simplified Chinese). Archived from the original on 27 May 2024. Retrieved 4 August 2024 – via NetEase.
- ^ 郑慧梓 (24 May 2024). "为大湾区一小时生活圈提速!广东城际"四线"将于5月26日贯通" [Speeding up the one-hour living circle in the Greater Bay Area! Guangdong's four intercity lines will be connected on May 26]. Nanfang Daily (in Simplified Chinese). Archived from the original on 24 May 2024. Retrieved 4 August 2024.
- ^ 钟晓宇 (23 May 2024). "开通在即!"大湾区地铁"番禺五站怎么乘车、购票?试乘攻略来了→" [Opening soon! How to ride and buy tickets at the five Panyu stations of the Greater Bay Area Metro? Here is the guide for a trial ride →]. Nanfang Daily (in Simplified Chinese). Archived from the original on 23 May 2024. Retrieved 4 August 2024.
- ^ a b "广惠城际铁路莲花站主体结构封顶" [The main structure of Lianhua Station of Guangzhou-Huizhou Intercity Railway has been topped out]. China Railway Construction Group Fifth Construction Co., Ltd. (in Simplified Chinese). 3 December 2020. Archived from the original on 5 February 2023. Retrieved 5 October 2025 – via Official WeChat Account.
- ^ "广州市城市轨道交通8号线东延工程(万胜围~莲花)环境影响报告书" [Environmental Impact Report for Guangzhou Urban Rail Transit Line 8 East Extension Project (Wanshengwei-Lianhua)] (PDF). China Railway Design Group (in Simplified Chinese). 22 November 2023. p. 40. Archived from the original on 22 November 2023. Retrieved 4 August 2024 – via Guangzhou Ecological Environment Bureau.