Jiazhuang station
Platform | |||||||||||||
| Chinese name | |||||||||||||
| Simplified Chinese | 加庄站 | ||||||||||||
| Traditional Chinese | 加莊站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Fork of Nanyun 5th Road (南云五路) and Kefeng Road (科丰路), border of Lianhe and Dasha Subdistricts Huangpu District, Guangzhou, Guangdong China | ||||||||||||
| Coordinates | 23°9′2.34″N 113°27′17.64″E / 23.1506500°N 113.4549000°E | ||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
| Line | Line 7 | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | 716 | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2023 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Jiazhuang Station (simplified Chinese: 加庄站; traditional Chinese: 加莊站; pinyin: Jiāzhuāng Zhàn; Cantonese Yale: Gājōng Jaahm) is a station of Guangzhou Metro Line 7, located underground at the fork of Nanyun 5th Road and Kefeng Road in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]
Station layout
| G | Street level | Exits B, C, D |
| L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Facilities |
| L2 Platforms |
Platform 2 | 7 towards Meidi Dadao (Jitang) |
| Island platform, doors will open on the left (Toilets, Nursery) | ||
| Platform 1 | 7 towards Yanshan (Kefeng Lu) | |
Entrances/exits
The station has 3 points of entry/exit, with Exit C being accessible via elevator.[1]
-
Entrance B
-
Entrance C
-
Entrance D
History
In July 2019, the station site began enclosure construction.[3] In September the same year, the station started construction of the main station structure.[4] On 16 August 2020, the main structure of the second section of this station was topped out.[5]
The station completed the "three rights" transfer on 7 November 2023.[6] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]
Future development
The station is planned to have an interchange with Line 23.[7] It was originally not designated to be an interchange station, but got altered in July 2018.[8]
References
- ^ a b "加庄". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
- ^ a b "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通" [Guangzhou Metro Line 7 Phase II and Line 5 East Extension opened for operation, and Changzhou Island sent out lion dance to welcome the opening]. New Express Daily (in Simplified Chinese). 28 December 2023. Archived from the original on 28 December 2023. Retrieved 5 January 2024.
- ^ "扩散!7月10日起地铁加庄站将围蔽施工,交通疏解方案→" [Spread! Starting from July 10, Jiazhuang Metro Station will be fenced off for construction, traffic relief plan →]. Ocean Network (in Simplified Chinese). 9 July 2019. Archived from the original on 21 February 2020.
- ^ "广州市轨道交通七号线二期工程五分部土建工程加庄站主体围护结构顺利开工" [The main enclosure structure of the fifth division of the second phase of Guangzhou Metro Line 7, Jiazhuang Station, started smoothly]. China Railway Fourth Engineering Group Urban Rail Transit Engineering Branch (in Simplified Chinese). 5 September 2019. Archived from the original on 22 January 2023.
- ^ "广州地铁七号线二期五项目部加庄站第二段主体结构顺利封顶" [The main structure of the second section of Jiazhuang Station of Guangzhou Metro Line 7 Phase 2 Project Department 5 was successfully topped out] (in Simplified Chinese). China Railway Fourth Engineering Bureau Guangzhou Metro Line 7 Phase II Project Department 5. 18 August 2020. Archived from the original on 22 January 2023. Retrieved 16 February 2025.
- ^ "决战决胜四季度丨转交"金钥匙",中铁北京局承建的广州地铁七号线二期车站完成"三权移交"" [Decisive battle for victory in the fourth quarter丨Handing over the "golden key", the second phase of Guangzhou Metro Line 7 station constructed by China Railway Beijing Engineering Bureau completed the "three rights transfer"]. China Railway Beijing Engineering Bureau No. 2 Company (in Simplified Chinese). 28 December 2023. Archived from the original on 6 November 2023. Retrieved 5 January 2024.
- ^ "广州地铁建设又有新进展:23号线、25号线规划曝光" [Guangzhou Metro construction has made new progress: Line 23 and Line 25 plans revealed]. Released in Guangzhou, China (in Simplified Chinese). 24 September 2018. Archived from the original on 24 September 2018. Retrieved 5 January 2024 – via Sina Corporation.
- ^ 李天研 (26 July 2018). "两条地铁新线各增一换乘站" [Two new metro lines each add one transfer station]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 30 August 2018. Retrieved 5 January 2024 – via Sina News.