Cirebon Prujakan–Kroya railway
| Cirebon Prujakan–Kroya railway | |
|---|---|
Sawunggalih Utama passing Sakalibel railway bridge before the double track railway is under construction, 2005 | |
| Overview | |
| Native name | Jalur kereta api Cirebon Prujakan–Kroya |
| Status | Operational |
| Owner | Directorate General of Railways (DJKA) |
| Locale | Cirebon, West Java - Kroya, Central Java |
| Termini | |
| Stations | 19 |
| Service | |
| Type | Inter-city rail |
| Operator(s) | PT Kereta Api Indonesia |
| History | |
| Opened | 1916 |
| Technical | |
| Number of tracks | 2 |
| Track gauge | 1,067 mm (3 ft 6 in) |
| Electrification | not available |
Cirebon Prujakan–Kroya railway is an middle railway line that connecting between Cirebon Prujakan and Kroya via Purwokerto that main corridor between Jakarta and Yogyakarta. This railway line have 2 railway tunnels, like the Kebasen railway tunnel & Notog railway tunnel, also have some railway bridge, like the Sakalibel railway bridge and more railway bridge.
This railway line have a characteristic, in Cirebon Prujakan-Kroya segment only passing the mountainous area in west side and Mount Slamet on the right side.
History
Began Construction
The Staatsspoorwegen (SS) wanted the Batavia–Surabaya connection to be implemented in one day. The construction of the Cirebon Prujakan–Kroya line was stipulated in a law dated 31 December 1912 (Staatsblad 1913 No. 32); although it was heavily criticized by the expert committee regarding how profitable the line would be in the future. On 1 July 1916, the 73 km Cirebon Prujakan–Prupuk (Margasari) section, and the 51 km Kroya–Patuguran section, were completed. On 1 January 1917, the Patuguran–Prupuk link (32 km) was also completed. However, this effort was not successful. Opposition from the Volksraad and cuts to the state capital participation (PMN) budget for the SS meant that service users still had to stay overnight in Yogyakarta before being able to continue to Surabaya.
The Jakarta-Surabaya connection was still interrupted due to the existence of the Semarang-Vorstenlanden railway line, which had the status of a Nederlandsch-Indische Spoorweg Maatschappij (NIS) concession line with standard gauge. Although in 1899 a third rail (double gauge) was installed to allow trains with standard gauge, SS trains had to share the line with NIS trains, with limited capacity. Only in 1925 did SS receive permission to build its own line next to the NIS line, so that SS trains could continue to run on their own lines, with the agreement that the land used would remain under NIS concession. In 1929, this one-day connection was realized with the presence of the Eendaagsche Express.[1]
Double track project
The double-track railway project was then restarted by the Directorate General of Railways (DJKA) in 2008, when construction of the Purwokerto–Patuguran double-track segment began in May. The project was divided into three phases: Cirebon Prujakan–Prupuk, Prupuk–Purwokerto, and Purwokerto–Kroya. In the first segment, Prupuk–Purwokerto was built first, because the terrain is mountainous and has a higher frequency of passenger train traffic than the other segments. Due to limited state budget funds, only rail construction and some changes to the signaling system were carried out. In addition to building the track, two underpasses were also built in Legok, Karanggandul, and Kebocoran, each with two.[2] The Purwokerto–Patuguran segment begin operation on 9 September 2009,[3][4] Patuguran–Kretek segment as of 24 March 2011,[5] and completed with full operation of the Kretek–Prupuk segment as of 1 December 2011.[6]
To welcome the second phase, the Cirebon Prujakan emplacement was arranged, so that trains from the south can stop at Prujakan.[7] Tundjung Inderawan, who was then the Director General of Railways, explained the follow-up plan after this project, namely the construction of a double track across southern Java. Financing for the Cirebon-Prupuk double track project uses government sukuk (SBSN) with a contract value of Rp1.6 trillion, of which Rp800 billion has been disbursed to the DJKA, and the remainder will be continued in 2014. Meanwhile, Inderawan also said that the third phase of the project will use a Japanese loan.[8] The Larangan–Prupuk segment start operate on 29 May 2014,[9] Ciledug–Larangan segment as of 16 December 2014,[10] and Cirebon Prujakan–Ciledug as of 1 April 2015.[11]
Third segment is Purwokerto–Kroya, started in December 2015.[12] Vice President of KAI Daop V Purwokerto, Dwi Erni Ratnawati, said that the project was slower compared to the previous project. This was due to the construction of the Serayu Kebasen railway ridge and two new tunnels (Notog and Kebasen). Meanwhile, Suyanto, who was then the manager of Railways and Bridges, the construction of the tunnels was intended to reduce the number of curves so that trains could travel up to 100 kilometres per hour (62 mph).[13] An beginning of the trial double track on 28 January 2019[14][15] and the relocation of the route to the new Notog Tunnel and two bridges north of the tunnel as of 15 February 2019,[16] then automatically the old routes, bridges and tunnels are closed and made into cultural heritage sites.[17] Next, as of 5 March 2019, this last segment was connected and officially operational.[18]
On 11 January 2021 at 21.30 local time, The old Kali Glagah railway bridge, a colonial legacy located in the Bumiayu-Linggapura section, collapsed due to flooding. As a result, trains passing through the section were diverted via Bandung and the northern route for several days. The following day, the railway line was declared open for use, but only one track was operational for the time being. There were no fatalities in the incident.[19][20] This incident caused Linggapura Station to be reactivated for railway crossings.[21] Finally, on 15 April 2023, Bumiayu–Linggapura section returned to the double track after BH 1120 bridge were operated back.[22]
Service
Passenger
Inter-city
Commuter
| Train name | Class | Route | |
|---|---|---|---|
| Joglosemarkerto | Executive and economy | Solo Balapan | Semarang Tawang (clockwise via Yogyakarta and Purwokerto) |
| Solo Balapan (counterclockwise via Tegal and Purwokerto) | |||
| Executive-Premium Economy | Yogyakarta | Cilacap | |
| Kamandaka | Executive-Economy | Semarang Tawang | |
Freight
| Train name | Route | |
|---|---|---|
| Southern Java line | ||
| Cement Cargo Solusi Bangun Indonesia | Karangtalun | Lempuyangan |
| Solo Balapan | ||
| Brambanan | ||
| Cirebon Prujakan | ||
| Avtur Pertamina cargo | Cilacap | Rewulu |
| Angkutan pupuk Pupuk Indonesia | Ceper | |
| Prupuk | ||
| Overnight train service Middle Parcel | Kampung Bandan | Malang |
| BBM Pertamina Cargo | ||
| Maos | Tegal | |
| Northern Java Line | ||
See also
References
- ^ Raap, O.J. (2017). Sepoer Oeap di Djawa Tempo Doeloe. Jakarta: Kepustakaan Populer Gramedia. p. 114. ISBN 9786024243692.
- ^ "Jalur Ganda Mulai Dibangun di Purwokerto". Kompas.com. 2008-06-06. Retrieved 2025-01-19.
- ^ "PT KAI Ujicoba Rel Ganda Purwokerto-Patuguran". Tempo.co (in Indonesian). 2009-06-23. Retrieved 2019-08-08.
- ^ "Presiden SBY Resmikan Jalur Ganda KA". Kompas.com (in Indonesian). Retrieved 2019-08-08.
- ^ Khasni, Iwan Al. "Jalur Ganda Kereta Api Segera Beroperasi". Tribunnews.com (in Indonesian). Retrieved 2019-01-31.
- ^ "Jalur ganda KA Purwokerto-Prupuk pangkas 15 menit perjalanan – BanyumasNews.com" (in Indonesian). Archived from the original on 2019-08-08. Retrieved 2019-08-08.
- ^ Afrilianti, D. (2011-11-22). "PT KAI Ubah Grafik Perjalanan Kereta Api per 1 Desember : Okezone Nasional". Okezone (in Indonesian). Retrieved 2025-01-21.
- ^ Sulistyono, Arif Gunawan (2012-10-18). "REL KERETA API: Kemenhub Bersiap Garap Proyek Jalur Ganda Lintas Selatan Jawa". Bisnis.com (in Indonesian). Retrieved 2025-01-19.
- ^ Jateng, Tribun. "Hore ! Jalur Ganda KA Prupuk-Larangan Diresmikan". Tribunnews.com (in Indonesian). Retrieved 2018-05-11.
- ^ "Jalur Ganda Larangan-Ciledug Resmi Dioperasikan". Republika Online. 2014-12-17. Retrieved 2019-08-07.
- ^ Sari, Lukman Diah. "Besok Jalur Double Track Cirebon-Kroya Bisa Digunakan". Medcom.id. Retrieved 2019-08-07.
- ^ "Jalur Ganda Jurusan Purwokerto-Kroya Mulai Dibangun". Antara Jateng. 2016-03-03. Retrieved 2025-01-19.
- ^ "2018, Pembangunan Jalur Ganda Purwokerto-Kroya Selesai". Antara Jateng. 2017-01-12. Retrieved 2025-01-19.
- ^ Heksantoro, Rinto. "Uji Coba Jalur Ganda, Perjalanan KA Jalur Selatan Terganggu". detikcom. Retrieved 2019-01-31.
- ^ Arnani, Mela. Galih, Bayu (ed.). "Jalur Ganda Kroya-Kebasen Diuji, 10 Kereta Ini Alami Keterlambatan". Kompas.com (in Indonesian). Retrieved 2019-01-31.
- ^ Anugrah, Arbi. "Double Track Stasiun Kroya-Purwokerto Sudah Beroperasi". detikcom (in Indonesian). Retrieved 2020-02-15.
- ^ Chandra, Ardan Adhi. "Terowongan Jalur Ganda KA Tembus Bukit di Banyumas Siap Operasi 2018". detikcom. Retrieved 2018-02-02.
- ^ Wicaksono, Megandika (2019-01-15). "Jalur Purwokerto-Kroya Terus Dikebut". kompas.id (in Indonesian). Retrieved 2025-01-19.
- ^ Setiadi, Tresno. Khairina (ed.). "Jembatan Rel KA Surabaya-Jakarta di Brebes Putus Diterjang Arus Sungai". Kompas.com. Retrieved 2021-01-16.
- ^ Fadli, Ardiansyah. Alexander, Hilda B (ed.). "Penyangga jembatan kereta api ambruk, KAI gunakan jalur tunggal". Kompas.com. Retrieved 2021-01-16.
- ^ "Jalur Rel Ganda Terganggu, Stasiun Linggapura Jadi Titik Antrean Persilangan KA". iNews.ID (in Indonesian). 2021-01-14. Retrieved 2021-02-10.
- ^ Sri Rahayu, Isna Rifka (12 May 2023). "Mulai 1 Juni 2023, KAI Tambah 3 Kereta Api Jarak Jauh Baru". Kompas.com. Jakarta: KG Media. Retrieved 13 May 2023.