Baiyun Airport South railway station

Baiyun Airport South

白云机场南
Platform
Chinese name
Simplified Chinese白云机场南站
Traditional Chinese白雲機場南站
Transcriptions
Standard Mandarin
Hanyu PinyinBáiyún Jīchǎng Nán Zhàn
Yue: Cantonese
Yale RomanizationBaahk'wàhn Gēichèuhng Nàahm Jaahm
JyutpingBaak6wan4 Gei1coeng4 Naam4 Zaam6
General information
LocationWest side of the east connecting building of Guangzhou Baiyun International Airport Terminal 1
Huadong, Huadu District, Guangzhou, Guangdong
China
Coordinates23°23′8.394″N 113°17′52.476″E / 23.38566500°N 113.29791000°E / 23.38566500; 113.29791000
Owned byPearl River Delta Metropolitan Region intercity railway
Operated byGuangdong Intercity Railway Operation Co., Ltd.
Line     Guangzhou East Ring intercity railway
Platforms2 (1 island platform)
Tracks2
Connections Guangzhou Baiyun International Airport (Terminal 1)
 3  Airport South (Terminal 1)
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeBNA (Pinyin: BYN)
History
Opened29 September 2025 (2025-09-29)
Services
Preceding station Pearl River Delta Metropolitan Region Intercity Railway Following station
Baiyun Airport North
towards Huadu
Guangzhou East Ring intercity railway Baiyun Airport East
towards Panyu
Transfer at Airport South (Terminal 1)
Preceding station Guangzhou Metro Following station
Gaozeng
towards Haibang
Line 3
transfer at Airport South (Terminal 1)
Airport North (Terminal 2)
towards Airport North (Terminal 2) or Tianhe Coach Terminal
Location

Baiyun Airport South railway station (simplified Chinese: 白云机场南站; traditional Chinese: 白雲機場南站; pinyin: Báiyún Jīchǎng Nán Zhàn; Cantonese Yale: Baahk'wàhn Gēichèuhng Nàahm Jaahm) is a station on Guangzhou East Ring intercity railway located in Huadu District, Guangzhou, Guangdong, China. It is located underground between the east connecting building and the P2 parking lot of Terminal 1 of Guangzhou Baiyun International Airport.[1] It opened on 29 September 2025.[2]

Features

The station has an underground island platform.

Entrances/exits

The station has 4 points of entry/exit, lettered A-D. Currently only Exits A and B are open, both are located on Airport Avenue East.

  • A: Airport Avenue East
  • B: Airport Avenue East
  • C: (Not open)
  • D: (Not open)

History

The station was called Airport Terminal 1 station during the planning and construction phase. It was renamed to Baiyun Airport South station on 2 February 2021.[3]

The station began construction on 26 November 2018,[4] and construction of the main structure began on 14 January 2020.[5] The station structure topped out on 18 January 2022.[6]

On 29 September 2025, the station opened.[2]

Transfer

The station provides interchange to Guangzhou Metro Line 3, and via passage towards the northern extension of Line 22, known as the Fangbai Intercity.

References

  1. ^ 贾明兴 (2022). "大型机场航站区轨道交通施工期间的运营保障⸺以珠三角城际新白广项目机场T1站为例" [Operational support for rail transit during construction in large airport terminal areas – a case study of Airport T1 Station in the Pearl River Delta Intercity New Baiguang Project] (PDF). High-speed Rail Express (in Simplified Chinese) (10): 28-30. Archived from the original (PDF) on 10 April 2025. Retrieved 1 October 2025.
  2. ^ a b 李天研 (28 September 2025). "广州地铁官宣:3条(段)城际铁路2条(段)地铁9月29日开通" [Guangzhou Metro officially announced: 3 intercity railway lines (sections) and 2 subway lines (sections) will open on 29 September]. Guangzhou Daily. Archived from the original on 28 September 2025. Retrieved 1 October 2025.
  3. ^ "广东省交通运输厅关于新白广城际新塘至机场T2段项目车站站名命名方案的批复" [Guangdong Provincial Department of Transportation's reply on the station naming plan for the Xinbaigang Intercity Xintang to Airport T2 section project] (PDF). Guangdong Provincial Department of Transportation (in Simplified Chinese). 2 February 2021. Archived from the original (PDF) on 7 April 2022. Retrieved 1 October 2025.
  4. ^ 李天研 (26 November 2018). "广州新白广城际轨道全面施工 今后广州北7分钟至机场" [Guangzhou Xinbaigang Intercity Railway is under construction, and it will take only 7 minutes to get from Guangzhou North to the airport.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 5 February 2023 – via Phoenix.com.
  5. ^ "新白广城际T1航站楼站实体工程正式拉开序幕" [The physical construction of Xinbaigang Intercity T1 Terminal Station officially kicked off]. Guangdong Huasui Construction Group (in Simplified Chinese). 21 January 2020. Archived from the original on 5 February 2023. Retrieved 1 October 2025 – via Official WeChat Account.
  6. ^ "六年磨一剑 今朝展锋芒——新白广城际机场T1航站楼站顺利封顶" [After six years of hard work, the T1 terminal of Xinbaigang Intercity Airport has been successfully topped out.]. Guangdong Huasui Construction Group (in Simplified Chinese). 18 January 2022. Archived from the original on 5 February 2023. Retrieved 1 October 2025 – via Official WeChat Account.