Airport North station (Guangzhou Metro)
Platform 1 | ||||||||||||||||||||||||||
| Chinese name | ||||||||||||||||||||||||||
| Simplified Chinese | 机场北站(2号航站楼) | |||||||||||||||||||||||||
| Traditional Chinese | 機場北站(2號航站樓) | |||||||||||||||||||||||||
| ||||||||||||||||||||||||||
| General information | ||||||||||||||||||||||||||
| Location | Huadu District, Guangzhou, Guangdong China | |||||||||||||||||||||||||
| Coordinates | 23°23′49.61″N 113°18′21.27″E / 23.3971139°N 113.3059083°E | |||||||||||||||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||||||||||||
| Lines | ||||||||||||||||||||||||||
| Platforms | 2 (2 side platforms) | |||||||||||||||||||||||||
| Connections | Guangzhou Baiyun International Airport (Terminal 2) Baiyun Airport North | |||||||||||||||||||||||||
| Construction | ||||||||||||||||||||||||||
| Structure type | Underground | |||||||||||||||||||||||||
| Other information | ||||||||||||||||||||||||||
| Station code | 330 | |||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||
| Opened | 26 April 2018 | |||||||||||||||||||||||||
| Services | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
Airport North (Terminal 2) station (simplified Chinese: 机场北站(2号航站楼); traditional Chinese: 機場北站(2號航站樓); Cantonese Yale: Gēichèuhng Bāk Jaahm (Yihhouh Hòhngjaahmlàuh)), is a station and northern terminus of Line 3 of the Guangzhou Metro. It started operations on 26 April 2018 following the opening of Guangzhou Baiyun International Airport's Terminal 2.[1] It is located right under the airport terminal and the station has an escalator connecting the station directly with the check-in area of Terminal 2 of the Guangzhou Baiyun Airport.
Station layout
| G | Street level | Exit |
| L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
| L2 Platforms |
Side platform, doors will open on the right | |
| Platform 1 | 3 towards Haibang (Airport South) | |
| Platform 2 | 3 termination platform | |
| Side platform, doors will open on the right | ||
References
- ^ 三号线机场北站4月26日开通试运营 (in Simplified Chinese). Guangzhou Metro. 2018-04-23. Archived from the original on 2018-04-23. Retrieved 2018-07-02.