Xunfenggang station
Line 6 station exterior | |||||||||||||||
| Chinese name | |||||||||||||||
| Simplified Chinese | 浔峰岗站 | ||||||||||||||
| Traditional Chinese | 潯峰崗站 | ||||||||||||||
| |||||||||||||||
| General information | |||||||||||||||
| Location | East side of the intersection of Jinshazhou Road (金沙洲路) and Xunfengshan East Road (浔峰山东路) Jinshazhou, Baiyun District, Guangzhou, Guangdong China | ||||||||||||||
| Coordinates | 23°10′0.10″N 113°11′47.31″E / 23.1666944°N 113.1964750°E | ||||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||||
| Lines | |||||||||||||||
| Platforms | 5 (1 island platform and 3 side platforms) | ||||||||||||||
| Tracks | 5 | ||||||||||||||
| Construction | |||||||||||||||
| Structure type | Elevated (Line 6) Underground (Line 12) | ||||||||||||||
| Accessible | Yes | ||||||||||||||
| Other information | |||||||||||||||
| Station code | 601 1201 | ||||||||||||||
| History | |||||||||||||||
| Opened | |||||||||||||||
| Services | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
Xunfenggang Station (simplified Chinese: 浔峰岗站; traditional Chinese: 潯峰崗站; pinyin: Xúnfēnggǎng Zhàn; Cantonese Yale: Chàhmfūnggōng Jaahm) is an interchange station between Line 6 and Line 12 of the Guangzhou Metro, and serves as the western terminus for both lines.[1] The Line 6 station started operations on 28 December 2013.[2] It is located at the south of the area of Xunfenggang (浔峰岗), A1 Road, Jinshazhou, Baiyun District.[3] The terminus approaches near Lishui, Nanhai District, Foshan, which is just over the hill next to the station.[4] Line 12 opened at this station on 29 June 2025, thus becoming an interchange station.
Station layout
The station is divided into two sections, Line 6 and Line 12, of which the two lines are connected by a passenger distribution concourse on the ground level. It is surrounded by Xunfengshan East Road, Jinshazhou Road, Xunfenggang Bus Terminus and other nearby buildings.
Both station sections include toilets, of which the Line 6 toilets is located in the non-paid area of the surface level concourse, and toilets and a nursery room are located at the western end of the two side platforms on Line 12.
Line 6
The Line 6 station is a three-storey elevated station. The ground floor is the concourse, the second floor is a pedestrian overpass, and the third floor are the platforms for Line 6.
| F3 Platforms |
- | Exit C (Exiting only) Via passenger distribution concourse towards Line 12 |
| Side platform, doors will open on the right | ||
| Platform 2 | 6 termination platform | |
| Platform 1 | 6 towards Xiangxue (Hengsha) | |
| Island platform, doors will open on the left, right | ||
| Platform 3 | No regular service | |
| F2 | - | Pedestrian overpass |
| G Concourse |
Lobby | Exits A and B, Ticket Machines, Customer Service, Toilets, Police Station, Security Facilities |
Line 12
The Line 12 station is a three-storey underground station. The ground floor is the passenger distribution concourse (with Exits D1 and D2) and Exits E, F and H, the first floor is the concourse and other passageways, and the second floor are the platforms for Line 12.
| G Concourse |
Passenger Distribution Lobby | Exits D1, D2, E, F, H, Ticket Machines, Customer Service, Security Screening Facilities Towards Line 6 platforms and Line 12 concourse |
| L1 Concourse |
Transfer Passage | Via passenger distribution concourse towards Line 6 |
| 12 Lobby | Ticket Machines, Customer Service, Police Station, Security Facilities | |
| L2 Platforms |
Side platform, doors will open on the right | |
| Platform 5 | 12 termination platform | |
| Platform 4 | 12 towards Guangzhou Gymnasium (Xunfenggang North) | |
| Side platform, doors will open on the right | ||
Concourse and transfer method
The concourse is divided into 3 parts, Line 6, Line 12 and the passenger distribution concourse. The Line 6 and passenger distribution concourses are located on ground level, and the Line 12 concourse is located on the first underground floor. The three are not connected to each other in the non-paid area, and passengers from the Line 6 concourse will need to pass through the Line 6 platforms first before reaching the passenger distribution concourse and the Line 12 station.
There are elevators, escalators, and stairs in the fare-paid areas of the Line 6 and Line 12 concourses for passengers to reach the platforms. There is a long passage in the southwest corner of the station leading to the passenger distribution concourse to transfer to Line 6. Exits E, F and H are separated by a paid area. The passenger distribution concourse handles the transfer between Line 6 and Line 12 via escalators, stairs and an elevator.
There are automatic ticket machines and an intelligent customer service center at all three concourses. There is an automated external defibrillator near Exit B on the Line 6 concourse.[5]
-
Line 6 concourse
-
Line 12 concourse
-
Passenger distribution concourse
Platforms
The Line 6 station has an island and side platform, located above the east side of Jinshazhou Road. Line 12 has two side platforms and is located under Xunfengshan East Road. The two platforms form an "L" shape that rotates 45 degrees clockwise.
Line 6 only uses the side platform 2 and platform 1 on the island platform. Platform 3 on the other side of the island platform is a standby platform for storing standby trains and diverting traffic during morning and evening rush hours.
-
Line 6 platforms 1 and 3 (originating platform)
-
Line 12 platform 4 (originating platform)
-
Line 12 platform 5 (termination platform)
Line configuration
On the southeast side of the Line 6 platforms is a single maneuvering line, which can facilitate switchback before heading into platform 1. There are also several maneuvering lines to the northwest of the platforms arranged in a "figure eight" shape for train turnback. The main line continues to Xunfenggang Stabling Yard as an entry and exit line. Line 12 has a single maneuvering line on the northeast side of the platform for train switchback before the station, and a set of crossing lines on the southwest side for train turnback after the station.
Entrances/exits
The station has 8 points of entry/exit, distributed between the Line 6 concourse, passenger distribution concourse and Line 12 concourse. It is worth mentioning that Exit C on the north side of Line 6 platform 2 is exit only and directly connects to the pedestrian overpass across Jinshazhou Road. The exit was temporarily closed on 8 November 2024 to facilitate the access works of the transfer passage and was reopened after the opening of Line 12. Exits A, B, D1 and D2 have accessible ramps.
Line 6 concourse (ground level)
Line 6 Platform 2 (third floor above ground)
- C: Jinshazhou Road (exiting only)
Line 12 concourse (first floor underground)
- E: Xunfengshan East Road
- F: Xunfengshan West Road
- H: Xunfengshan East Road
Passenger distribution concourse (ground level)
-
Exit A
-
Exit B
-
Exit C (exiting only)
-
Entrance D1
-
Entrance D2
-
Entrance E
-
Entrance F
-
Entrance H
History
Planning and construction
The station appeared as Line 6's western terminus in the 2003 metro plan, serving the northern part of Jinshazhou.[6] Subsequently, the station was confirmed to be one of the first stations of Line 6 for construction.
The station was originally designed with only one set of side platforms (i.e. platforms 1 and 2, similar to Hengsha and Shabei down the line). However, in the later design of Line 6, a side-line was added to the west side of platform 1, and platform 1 was changed to an island platform (adding the existing platform 3). At the same time, the maneuvering arrangements before and after the station were rearranged to increase the station's turnback capacity and the efficiency of train intervals, thereby increasing the extreme frequency density of Line 6 as much as possible.
On 15 January 2013, the Line 6 station completed the "three rights" transfer. On 28 December the same year, the station was opened with the official opening of Line 6's initial phase.[7]
Line 6 trains have only four carriages, and the operating capacity cannot meet the future demand for passenger flow between Jinshazhou and the city center. In the latest version of the Jinshazhou area plan approved by the Municipal Planning Commission in May 2014, Line 12 which was originally planned to be extended to Lishui was diverted to this station, and intersected with Line 6 to set up an interchange in order to ease the passenger flow in the Jinshazhou area.[8][9]
On 28 February 2025, the Line 12 station completed the "three rights" transfer.[10] On 29 June the same year, the station was opened.[11]
Operational incident
During COVID-19 pandemic control rules in 2022, the station was suspended from 21 to 27 November 2022.[12][13]
See also
- Xunfenggang North station, another Guangzhou Metro Line 12 station, north of Xunfenggang
References
- ^ Xunfenggang-Heshaxi line of Guangzhou Metro 6th Line Archived 25 December 2007 at the Wayback Machine
- ^ Construction for three metro lines advanced Archived 2011-07-23 at the Wayback Machine
- ^ 金沙洲:一岛两制 有点尴尬 (in Simplified Chinese). Archived from the original on 7 July 2011.
- ^ 赵岚 (30 April 2009). "里水镇长朱辉球:广州地铁能不能延长到里水?" [Lishui Town Mayor Zhu Huiqiu: Can the Guangzhou Metro be extended to Lishui?]. Foshan Daily (in Simplified Chinese). Archived from the original on 26 July 2011.
- ^ "广州地铁卫生间、母婴室和AED信息" [Guangzhou Metro toilets, nursery rooms and AED information]. Guangzhou Metro (in Simplified Chinese). Guangzhou. 27 June 2025. Archived from the original on 22 July 2023.
- ^ 张睿 (4 September 2007). "广州地铁后年连通金沙洲元岗" [Guangzhou Metro to connect Jinshazhou and Yuangang next year]. Nanfang Daily (in Simplified Chinese). Archived from the original on 9 May 2022 – via Sina News.
- ^ "广州地铁六号线试运营逾15万人次尝鲜 明日迎考验" [Guangzhou Metro Line 6 has over 150,000 passengers in trial operation, to face test tomorrow]. Yangcheng Evening News (in Simplified Chinese). 29 December 2013. Archived from the original on 14 January 2023 – via Sina News.
- ^ 杜娟 (30 May 2014). "地铁12号线延至金沙洲 大坦沙新增2过江通道" [Metro Line 12 extended to Jinshazhou, Datansha added 2 cross-river passages]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 30 May 2014.
- ^ "广州回绝地铁12号线接入佛山里水" [Guangzhou rejects proposal to connect Metro Line 12 to Foshan Lishui]. Southern Metropolis Daily (in Simplified Chinese). 14 February 2014. Archived from the original on 14 January 2023 – via Sohu Focus.
- ^ "省安新闻 | 广州地铁12号线浔峰岗站、里横路站临时"三权"移交仪式顺利举行" [Provincial Security News | The temporary "three rights" transfer ceremony of Xunfenggang Station and Liheng Road Station of Guangzhou Metro Line 12 was successfully held]. Guangdong Industrial Equipment Installation Co., Ltd. (in Simplified Chinese). 3 March 2025. Archived from the original on 4 March 2025. Retrieved 8 July 2025 – via Official WeChat Account.
- ^ 张楚琪 (29 June 2025). "广州地铁十二号线东西段开通,市民开心打卡点赞"好方便"" [The east and west sections of Guangzhou Metro Line 12 opened, and citizens happily checked in and praised it as "very convenient"]. Baiyun Media (in Simplified Chinese). Archived from the original on 29 June 2025. Retrieved 8 July 2025.
- ^ "广州地铁:11月21日起 白云区内所有地铁站停止对外服务" [Guangzhou Metro: All metro stations in Baiyun District will stop serving the public from 21 November]. Southern Network (in Simplified Chinese). 21 November 2022. Archived from the original on 21 November 2022.
- ^ 李天研 (28 November 2022). "白云海珠部分地铁站重开,番禺除南站之外全部地铁站暂停进出" [Some subway stations in Baiyun and Haizhu have reopened, and all metro stations in Panyu except Guangzhou South Railway Station have suspended entry and exit]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 28 November 2022.