Xiangyang–Jingmen high-speed railway

Xiangyang–Jingmen high-speed railway
Overview
Native name襄荆高速铁路
LocaleHubei, China
Termini
Stations4
History
Opened28 September 2025 (2025-09-28)
Technical
Line length116.7 km (72.5 mi)
Number of tracks2
Operating speed350 km/h (220 mph)
Route map

km
Zhengzhou–Wanzhou HSR from Zhengzhou East
Hankou–Danjiangkou railway Danjiang ↔ Hankou, Wuchang
Xiangyang East EMU Depot
Wuhan–Shiyan HSR from Hankou, Wuhan West
Xiangyang East
Wuhan–Shiyan HSR to Shiyan East
Zhengzhou–Wanzhou HSR to Chongqing North, Chongqing East
Han river
Yicheng
Jiaozuo–Liuzhou railway, Yiyang–Zhanjiang railway
Yueshan, Luoyang
Liuzhou, Zhanjiang
Haoji Railway Haolebaoji South ↔ Ji'an
Shuang West
Wuhan–Yichang HSR from Wuhan West
Jingmen West
Jingmen–Jingzhou HSR to Jingzhou
km

Xiangyang–Jingmen high-speed railway (Chinese: 襄荆高速铁路), or Xiangyang–Jingmen section of Hohhot–Nanning high-speed railway, is a high-speed railway line in Hubei, China. It will be 116.7 kilometres (72.5 miles) long with a maximum speed of 350 kilometres per hour (220 miles per hour) and four stations.[1]

Construction began in September 2022.[2]

The line began operation on 28 September 2025.[3]

Route

The line will approximately follow the existing Jiaozuo–Liuzhou railway between Xiangyang and Jingmen.

Stations

References

  1. ^ "设计时速350公里的襄荆高铁概况". 轨道世界. 2021-07-30. Retrieved 2022-11-03.
  2. ^ "『襄荆高铁』破土动工 湖北高铁网再添"一纵"". 湖北日报. 2022-09-29. Retrieved 2022-11-03.
  3. ^ Cheng, Dingwen. "襄荆高铁开通运营,湖北高铁环线"画圆"" [The Xiangjing High-speed Railway is open for operation, and the Hubei High-speed Railway Ring Line "draws a circle"] (in Chinese). China Internet News Center. Retrieved 24 December 2025.