Tsetsii Wind Farm

Tsetsii Wind Farm
Country
LocationÖmnögovi, Mongolia
Coordinates43°33′35.4″N 105°36′48.6″E / 43.559833°N 105.613500°E / 43.559833; 105.613500
StatusOperational
Commission dateOctober 2017
Construction costUS$120.7 million
Power generation
Units operational25 X 2 MW
Nameplate capacity50 MW

The Tsetsii Wind Farm is a 50 MW wind farm in Ömnögovi Province, Mongolia.

History

The wind farm was constructed at a cost of US$120.7 million and commissioned in October 2017.[1][2]

Upon commissioning, it became the second wind farm established in Mongolia after Salkhit Wind Farm.[3]

Technical specification

The wind farm has a total installed generating capacity of 50 MW.[1] It consists of twenty five 2MW turbines.[4]

See also

References

  1. ^ a b Froese, Michelle (6 October 2017). "Mongolia's 50-MW Tsetsii Wind Farm begins commercial operations". Windpower. Retrieved 3 August 2023.
  2. ^ Chinbat, Baigalmaa; Cabré, Miquel Muñoz (October 2024). "Solar and wind power in Mongolia: 2024 policy overview" (PDF). Stockholm Environment Institute. Retrieved 8 October 2025.
  3. ^ "Tsetsii Windfarm". European Bank for Reconstruction and Development. Retrieved 3 August 2023.
  4. ^ "Power plant profile: Tsetsii Wind Farm, Mongolia". Power Technology. 27 April 2023. Retrieved 3 August 2023.