Beijiaonongchang Qiao station
Construction site (taken in November 2025 from Huilongguan to Shangdi bicycle road) | ||||||||||||||||||||
| Chinese name | ||||||||||||||||||||
| Simplified Chinese | 北郊农场桥站 | |||||||||||||||||||
| Traditional Chinese | 北郊農場橋站 | |||||||||||||||||||
| ||||||||||||||||||||
| General information | ||||||||||||||||||||
| Location | Intersection of Longyu East 1st Road (龙域东一路) and planned Huichuang Road (回创路),[1] Huilongguan Subdistrict Changping District, Beijing China | |||||||||||||||||||
| Coordinates | 40°04′17″N 116°18′06″E / 40.0713°N 116.301781°E | |||||||||||||||||||
| System | Beijing Subway station | |||||||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||||||
| Line | Line 18 | |||||||||||||||||||
| Platforms | 4 (2 island platforms) | |||||||||||||||||||
| Tracks | 4 | |||||||||||||||||||
| Construction | ||||||||||||||||||||
| Structure type | Underground | |||||||||||||||||||
| Accessible | Yes | |||||||||||||||||||
| History | ||||||||||||||||||||
| Opened | Late-2025 (Line 18) 2027 (Line 13) Late–2029 (Line 19) | |||||||||||||||||||
| Previous names | Longyu (龙域), Xinlongze (新龙泽) | |||||||||||||||||||
| Services | ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
Beijiaonongchang Qiao station (simplified Chinese: 北郊农场桥站; traditional Chinese: 北郊農場橋站; pinyin: Běijiāo Nóngchǎng Qiáo zhàn; lit. 'Beijiao Farm Bridge station') is a future station on Lines 13 and 18 of the Beijing Subway. The Line 18 section is expected to open in late 2025, whilst the new Line 13 section is expected to open in late 2027. In the future, it will feature interchanges with Line 19 and BCR Northeast Ring line.[2][3]
Location
The station is located under the intersection of Longyu East 1st Road and planned Huichuang Road,[1] in Huilongguan Village,[4][5] Huilongguan Subdistrict, Changping District. It is named after Beijiao Farm Bridge on Jingzang Expressway.
Station features
Lines 13 & 18
The station will have two underground island platforms for Line 18 in its initial opening phase (which will combine to create a new Line 13 and re-routed Line 18 in 2027).[6]
Line 19
Another underground island platform for Line 19 (North extension) is expected to open in 2029.
Exits
The station will have 6 exits.[7] Exits A2, B, C, D and E are scheduled to open in late 2025.[8] Exit A1 will be a reserved exit.
History
The station was previously named as Xinlongze station (Chinese: 新龙泽站; pinyin: Xīnlóngzé zhàn). On November 10, 2022, construction of the first ground wall of the station of the station officially started.[9]
On March 20, 2025, the Beijing Municipal Commission of Planning and Natural Resources announced the naming plan for the expansion and upgrading project of Line 13, and planned to name the station as Longyu station (Chinese: 龙域站; pinyin: Lóngyù zhàn).[10]
In May 2025, the station was included in the 03-contract section of civil construction of the second phase of Line 19 (North Extension and North Extension Branch).[11]
On August 18, 2025, the Beijing Municipal Commission of Planning and Natural Resources announced the station is officially named as Beijiaonongchang Qiao station, named after Beijiao Farm Bridge on Jingzang Expressway.[12]
References
- ^ a b "新龙泽站近期接驳项目(施工)". 北京市公共资源交易服务平台. 2025-08-27.
新建临时龙域东一路,南起龙域东一路现状路,北至现状万科临时道路,道路全长224米,实施横断面宽度为12米;新建临时回创路东起现状京藏高速辅路,西至临时龙域东一路,道路全长372米,实施横断面宽度为12米;另新建2条临时道路,道路全长约223米,与临时回创路及京藏高速辅路衔接,实现区域微循环,实施横断面宽度为7-8米
- ^ "北京轨道交通19号线二期工程(北延及北延支线)环境影响评价第二次公示" [Second Public Notice of Environmental Impact Assessment for Phase II Project of Beijing Subway Line 19 (North Extension and North Extension Branch)] (in Simplified Chinese). 2024-10-21. Retrieved 2025-06-08.
- ^ "北京市郊铁路东北环线(南口至光华路段)工程环境影响评价征求意见稿(修改版)公示" [Public Notice of the Draft Environmental Impact Assessment for the Northeast Ring Line of Beijing Suburban Railway (Nankou to Guanghualu Section) (Revised Version)] (in Simplified Chinese). 2025-03-14. Retrieved 2025-06-08.
- ^ "昌平区回龙观镇土地利用总体规划".
- ^ "回龙观镇土地利用总体规划图".
- ^ "北京地铁13号线扩能提升工程新龙泽站,将于年底转入主体结构施工" [The Xinlongze Station of Beijing Metro Line 13 capacity expansion and upgrading project will enter the main structure construction at the end of the year] (in Simplified Chinese). 2024-08-19. Retrieved 2025-06-14.
- ^ "北京13号线8座新建车站年底结构封顶!最新线路图来了" [The eight new stations on Beijing Line 13 will be topped out by the end of the year! The latest route map is here] (in Simplified Chinese). 2024-06-14. Retrieved 2025-06-08.
- ^ "180余名建设者坚守北京轨道交通新龙泽站". 2025-10-02.
- ^ Beijing Construction Engineering Co., Ltd. (2022-11-16). "【学习贯彻党的二十大精神】北京地铁13号线04标项目顺利开工!" [[Study and implement the spirit of the 20th National Congress of the Chinese Communist Party] Beijing Subway Line 13 Section 04 project started smoothly!] (in Simplified Chinese). Retrieved 2025-06-08.
- ^ "关于轨道交通13号线扩能提升工程车站命名预案的公示(公示期限7天)" [Publicity on the naming plan for the station of Metro Line 13 capacity expansion and upgrading project (publicity period 7 days)] (in Simplified Chinese). 2025-03-20. Archived from the original on 2025-03-20. Retrieved 2025-06-08.
- ^ "北京轨道交通19号线二期工程(北延及北延支线)土建施工03合同段施工资格预审公告" [Announcement on the Prequalification of Construction Contract Section 03 of the Second Phase of Beijing Metro Line 19 (North Extension and North Extension Branch) Civil Construction] (in Simplified Chinese). Beijing Engineering Construction Bidding and Tendering Transaction System. 2025-05-09. Retrieved 2025-06-08.
包括1站1区间(新龙泽站、西三旗站~新龙泽站区间)
[Includes 1 station and 1 section (Xinlongze Station, Xisanqi Station ~ Xinlongze Station section)] - ^ "地名公告". 2025-08-18. Archived from the original on 2025-08-19. Retrieved 2025-08-19.
External links
- Media related to Beijiaonongchang Qiao Station at Wikimedia Commons