Line 9 (Changchun Rail Transit)
| Line 9 | |
|---|---|
| Overview | |
| Status | Under Construction |
| Owner | Changchun |
| Locale | Changchun, Jilin, China |
| Termini |
|
| Stations | 8 (Phase 1)[1] |
| Service | |
| Type | Rapid transit |
| System | Changchun Rail Transit |
| Services | 1 |
| Operator(s) | Changchun Rail Transit Corporation |
| History | |
| Completed | 2027[2] |
| Technical | |
| Line length | 30.32 km (18.84 mi)[1] |
| Number of tracks | 2 |
| Character | Underground and Elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 9 of the Changchun Rail Transit (Chinese: 长春轨道交通九号线; pinyin: Chángchūn guǐdào jiāotōng jiǔ hào xiàn) is a rapid transit line running from Wukaihe Dajie to Jiutai South Railway Station including a station at Changchun Longjia Airport.[3] It is under construction and planned to open in 2027.[2]
History
Phase 1
Plans to open by 2027,[2] from Wukaihe Dajie to Jiutai South Railway Station.
References
- ^ a b "长春轨道交通9号线新消息!". 2023-08-24.
正线全长30.32km,包含8座车站、9座区间和2条出入段线、1座停车场、1座车辆段
- ^ a b c "通车时间来啦!涉及长春轨道交通多条线路". Archived from the original on 2025-05-03.
9号线1期:预计2027年通车
- ^ "长春高质高效推动轨道交通建设".