Green Line (Delhi Metro)

Green Line
(Line 5)
A new train being launched in the opening of the Kirti Nagar branch in 2011.
Overview
StatusPartly Operational
OwnerDMRC
LocaleDelhi, Bahadurgarh
Termini
Stations24+ 9 (Phase 4 construction)
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockMitsubishi-ROTEM-BEML
History
Opened
Technical
Line length28.79 km (17.89 mi)
CharacterElevated and At-grade
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Highest elevation215 m
Route map

Brigadier Hoshiyar Singh
Bahadurgarh City
Pandit Shree Ram Sharma
Delhi
Haryana
border
Tikri Border
Tikri Kalan
Ghevra
Najafgarh Road
Mundka Industrial Area (MIA)
Mundka
Rajdhani Park
Nangloi Railway Station
Nangloi
Najafgarh Road (towards Dhansa)
Maharaja Surajmal Stadium
Udyog Nagar
Peeragarhi
Outer Ring Road
Paschim Vihar West
Paschim Vihar East
Madipur
Shivaji Park
Punjabi Bagh West
Ring Road
Punjabi Bagh
Ashok Park Main
Inderlok
Daya Basti
Sarai Rohilla
Ajmal Khan Park
Jhandewalan Mandir
Nabi Karim
New Delhi
Delhi Gate
Mahatma Gandhi Marg
Delhi Sachivalaya
Indraprastha

The Green Line (Line 5) is a rapid transit metro line of the Delhi Metro in Delhi, India. The line consists of 24 stations covering a total length of 28.79 km (17.89 mi). It runs between Inderlok and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station.[1]

The line is almost fully elevated (except for Kirti Nagar Metro Station, which is at grade) and runs mostly along the busy NH 9 route in North Delhi and North West Delhi, bypassing Tikri Border to enter Bahadurgarh. It is the first Delhi metro line on standard gauge, as opposed to 5 ft 6 in (1,676 mm) broad gauge, prevalent in Red, Yellow and Blue Lines.

History

The line was opened in two stages, with the 15.1 km (9.38 mi) Inderlok – Mundka section opening on 3 April 2010[2] and the 3.5 km (2.17 mi) Kirti Nagar – Ashok Park Main branch line on 27 August 2011. Though its route is shorter than other lines, the Green Line serves as a lifeline for Delhiites connecting to the Red and Blue Lines, as it covers major commercial and residential areas like Punjabi Bagh, Paschim Vihar, Nangloi and Mundka.

On 6 August 2012, in a step that will improve commuting in National Capital Region, the Union government approved the extension of Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km (6.95 mi) metro stretch comprises seven stations with four of them in Delhi and the remaining three in Bahadurgarh -- Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma (Modern Industrial Estate), Bahadurgarh City (Bus Stand) and Brigadier Hoshiar Singh (City Park).[3]

Construction work of this extension began in 2013 and was completed by the second half of 2018, as part of the Phase III expansion. The inauguration of the Mundka – Bahadurgarh stretch took place on 24 June 2018.

In late October 2019, it was decided to construct steel platforms on the viaduct of Green Line between Punjabi Bagh and Shivaji Park stations that will provide a seamless interchange between Green Line and Pink Line.[4] Construction began in that year itself and the new halt platform of Green Line, named Punjabi Bagh West, was thrown open to the public on 29 March 2022, after multiple delays.[5]

The new halt platform of Green Line is connected by a Foot Over Bridge (FOB), which links with the Punjabi Bagh West station of the Pink Line. The FOB is 212 metres (696 ft) long. The new platforms are 155 metres (509 ft) in length and are connected with the FOB by two extra-large lifts on each platform with a capacity of 26 passengers each as well as staircases.[5]

Extension to Indraprastha

Under Phase-IV, six new lines covering a length of about 104 km (64.62 mi) were planned to be added to the metro network, out of which the extension of Green line would connect Inderlok with Indraprastha, at a length of 12.57 km (7.81 mi). The plans were finalized for implementation by the Government of Delhi in December 2018.[6]

A 12.37 km (7.69 mi) extension of Green Line with ten stations was approved by the Union Government in March 2024. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2029.[7][8][9]

Stations

Main Line

Green Line
# Station Name Opening Interchange Connection Station Layout Platform Level Type
English Hindi
1 Indraprastha इंद्रप्रस्थ 2029 Blue Line Underground Island
2 Delhi Sachivalaya दिल्ली सचिवालय 2029 None Underground Island
3 Delhi Gate दिल्ली गेट 2029 Violet Line Underground Island
4 LNJP Hospital एलएनजेपी अस्पताल 2029 None Underground Island
5 New Delhi नई दिल्ली 2029 Yellow Line
Airport Express
New Delhi
Underground Island
6 Nabi Karim पहाड़गंज 2029 Magenta Line
(Phase 4 - Under Construction)
Underground Island
7 Jhandewalan Mandir झंडेवालान मंदिर 2029 None Underground Island
8 Sarai Rohilla सराय रोहिल्ला 2029 Delhi Sarai Rohilla
Underground Island
9 Daya Basti दया बस्ती 2029 Dayabasti Underground Island
10 Inderlok इंद्रलोक 3 April 2010 Red Line Elevated Island
11 Ashok Park Main अशोक पार्क मेन 3 April 2010 Green Line Elevated Side
12 Punjabi Bagh East पंजाबी बाग़ 3 April 2010 None Elevated Side
13 Punjabi Bagh West पंजाबी बाग़ पश्चिम 29 March 2022 Pink Line Elevated Side
14 Shivaji Park शिवाजी पार्क 3 April 2010 Shakurbasti Elevated Side
15 Madipur मादीपुर 3 April 2010[10] None Elevated Side
16 Paschim Vihar East पश्चिम विहार पूर्व 3 April 2010 None Elevated Side
17 Paschim Vihar West पश्चिम विहार पश्चिम 3 April 2010 None Elevated Side
18 Peeragarhi पीरागढ़ी 3 April 2010 Magenta Line
(Phase 4 - Under Construction)
Elevated Side
19 Udyog Nagar उद्योग नगर 3 April 2010 None Elevated Side
20 Maharaja Surajmal Stadium महाराजा सूरजमल स्टेडियम 3 April 2010 None Elevated Side
21 Nangloi नांगलोई 3 April 2010 None Elevated Side
22 Nangloi Railway Station नांगलोई रेलवे स्टेशन 3 April 2010 Nangloi Elevated Side
23 Rajdhani Park राजधानी पार्क 3 April 2010 None Elevated Side
24 Mundka मुण्डका 3 April 2010 None Elevated Side
25 Mundka Industrial Area (MIA) मुण्डका औद्योगिक क्षेत्र 24 June 2018 None Elevated Side
26 Ghevra घेवरा 24 June 2018 None Elevated Side
27 Tikri Kalan टीकरी कलाँ 24 June 2018 None Elevated Side
28 Tikri Border टीकरी बॉर्डर 24 June 2018 None Elevated Side
29 Pandit Shree Ram Sharma
(Modern Industrial Estate)
पंडित श्री राम शर्मा
(मॉर्डन इंडस्ट्रियल एस्टेट)
24 June 2018 None Elevated Side
30 Bahadurgarh City
(Bus Stand)
बहादुरगढ़ सिटी
(बस स्टैंड)
24 June 2018 None Elevated Side
31 Brigadier Hoshiyar Singh
(Bahadurgarh City Park)
ब्रिगेडियर होशियार सिंह
(बहादुरगढ़ सिटी पार्क)
24 June 2018 None Elevated Side

Branch Line

Green Line Branch
# Station Name Opening Interchange Connection Station Layout Platform Level Type
English Hindi
1 Ashok Park Main* अशोक पार्क मेन* 3 April 2010 Green Line Elevated Side
2 Satguru Ram Singh Marg सतगुरु राम सिंह मार्ग 27 August 2011 Patel Nagar Elevated Side
3 Kirti Nagar कीर्ति नगर 27 August 2011 Blue Line At Grade Side

Train Info

Green Line
Rakes Mitsubishi Hyundai Rotem BEML
Train Length 4
Train Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification 25 kV, 50 Hz AC through overhead catenary
OHE
Train's Maximum Speed 100 km/h
Train Operation Inderlok - Mundka

Kirti Nagar - Brig. Hoshiyar Singh

Infrastructure

Green Line is equipped with Bombardier Cityflo 350 signalling.[2]

Rolling stock

The Green Line uses standard gauge trains manufactured by a consortium of Mitsubishi, Hyundai Rotem and Bharat Earth Movers (BEML). A total of 196 cars for the Green Line and the Violet Line were ordered for both 4-car configurations (46 trains) and 6-car configurations (2 trains). One train was manufactured in Changwon in South Korea and rest of the trains were manufactured at BEML's facility in Bangalore. Width of these trains is 2.9 meters as compared to 3.2 meters on broad gauge trains.[11]

Future extensions

  • Rohtak: Green Line (Delhi Metro) will be extended from existing metro station in Bahadurgarh to Rohtak in the following phases:
    • "Delhi Green Line Metro: Bahadurgarh to Asaudha extension": The Bahadurgarh (Brigadier Hoshiyar Singh metro station) to Asaudha extension to Asaudha railway station has been approved,[13] where it will interchange with Haryana Orbital Rail Corridor at Asaudha railway station.[14] From the existing Brigadier Hoshiar Singh metro station, it will extended east to Western Peripheral Expressway (WPE) with 5 new stations, namely Sankhol, Udhyog Vihar Sector 16 (near Somany Ceramics and Parle-G biscuit factory), HSIDC Sector 17, Jakhoda (eastern intersection of Delhi Road and Bahadurgarh Southern Bypass), HPCL Plant, and Asaudha near WPE (integrate with Asaudha railway station of Delhi-Rohtak-Hisar line and Haryana Orbital Rail Corridor (HORC)). Physical survey was completed in November 2025, DPR will be ready in 6 months by May 2026, after which tenders will be issued once the budget is approved.[15]
    • "Delhi Green Line Metro: Asaudha to Rohtak extension": It will be further extended from Asaudha to Rohtak city.[13]

See also

References

  1. ^ "PM Narendra Modi inaugurates Mundka-Bahardurgarh metro network". The Times of India. 24 June 2018.
  2. ^ a b "Delhi metro opens first standard gauge line". Railway Gazette. 6 April 2010. Archived from the original on 29 June 2010. Retrieved 5 September 2010.
  3. ^ Krar, Prashant (7 August 2012). "Centre approves Delhi-Bahadurgarh metro link". The Economic Times. ISSN 0013-0389. Retrieved 5 April 2024.
  4. ^ "Delhi: When changing stations means you have to get down in the middle of the metro track | Delhi News - Times of India". The Times of India. TNN. 18 October 2019. Retrieved 9 April 2021.
  5. ^ a b "Delhi metro's first interchange station inaugurated at Punjabi Bagh, connects Green line to Pink line". Home News India. West Punjabi Bagh, Punjabi Bagh, Delhi. 29 March 2022. Retrieved 31 March 2022.
  6. ^ "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024". News18. 20 December 2018. Retrieved 29 January 2024.
  7. ^ "Delhi to get two new Metro lines: Lajpat Nagar-Saket, Inderlok-Indraprastha". The Indian Express. 13 March 2024. Retrieved 5 April 2024.
  8. ^ "Delhi Metro Phase-IV: Union Cabinet approves two corridors of Delhi Metro Projects". The Hindu. 13 March 2024. ISSN 0971-751X. Retrieved 5 April 2024.
  9. ^ "Union Cabinet approves two new Metro lines in Delhi; check routes, stations". Business Today. 13 March 2024. Retrieved 5 April 2024.
  10. ^ "Metro Goes To Mundka On new green line". The Times of India. 1 April 2010. Archived from the original on 11 August 2011.
  11. ^ "Delhi Metro gets standard gauge train". Hindu Business Line. 18 March 2009. Archived from the original on 23 June 2009. Retrieved 5 September 2010.
  12. ^ "New Delhi underground metro aims to transform Central Vista by 2026".
  13. ^ a b Cite error: The named reference dna1 was invoked but never defined (see the help page).
  14. ^ NCR news: New Metro link from Gurugram’s Rezang La Chowk to Delhi IGI Airport, two more proposed, DNA, 24 Feb 2023.
  15. ^ Metro will be extended from Bahadurgarh to Asaudha in Haryana, haryanaekhabar.com, 17 Oct 2025.