Line 13 (Chengdu Metro)
| Line 13 | |
|---|---|
| 13 | |
| Overview | |
| Status | Operational |
| Owner | Chengdu |
| Locale | Chengdu, China |
| Termini |
|
| Stations | 21 |
| Service | |
| Type | Rapid transit |
| System | Chengdu Metro |
| Services | 1 |
| Operator(s) | Chengdu Metro Limited |
| Rolling stock | 8-car Type A (Driverless)[1] |
| History | |
| Opened | 16 December 2025 |
| Technical | |
| Line length | 29.07 km (18.06 mi)[2] |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 100 kilometres per hour (62 mph) (maximum) |
Line 13 of the Chengdu Metro (Chinese: 成都地铁13号线) is a metro line in Chengdu, Sichuan, China. The first phase of the line officially opened on 16 December 2025. This entire section is underground.
History
- On 11 November 2019, construction on line 13 began.[3]
- On 16 December 2022, Line 13 Phase 1 finished Sanguantang to Jiuyan Bridge Section tunnel construction, marking the success of the longest underwater/river tunnel work in Chengdu Metro history.[4]
- On 13 January 2023, 15 stations finished structural construction and tunnel finished 62%, railroad finished 10% [5]
- On 30 March 2023, Line 13 Jiuyan Bridge~Xinnanmen section's tunnel boring machine finished construction.[6]
- On 20 September 2023, Line 13's first train is finished. This is Chengdu's second metro line to use driverless automatic trains.[7]
- On 16 December 2025, Line 13 Phase 1 entered service.[8]
Incidents
- In June 2024 a part of Line 13 collapsed, destroying the road above.[9]
Opening timeline
| Segment | Commencement | Length | Stations | Name |
|---|---|---|---|---|
| Wayaotan — Long'an | 16 December 2025 | 29.07 km (18.06 mi)[2] | 21 | Phase 1 |
Stations
| Station name | Connections | ||||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| Wayaotan | 瓦窑滩 | ||||||
| Wanjiawan | 万家湾 | ||||||
| Peifeng | 培风 | 9 | |||||
| Wanshou Bridge | 万寿桥 | ||||||
| Dongpo Road | 东坡路 | 7 | |||||
| Guanghuacun | 光华村 | ||||||
| Du Fu Thatched Cottage | 杜甫草堂 | ||||||
| Qingyang Taoist Temple | 青羊宫 | 5 | |||||
| Xiaonan Street | 小南街 | 17 | |||||
| Wenweng Shishi | 文翁石室 | 10 | |||||
| Huaxiba | 华西坝 | 1 | |||||
| Xinnanmen | 新南门 | 3 | |||||
| Jiuyan Bridge | 九眼桥 | ||||||
| Sanguantang | 三官堂 | 6 | |||||
| Jingjusi | 净居寺 | 8 | |||||
| Sichuan Normal University | 四川师大 | 7 | |||||
| Jiaozi Flyover | 娇子立交 | 30 | |||||
| Xingfu Meilin | 幸福梅林 | ||||||
| Sansheng Flower Town | 三圣花乡 | ||||||
| Longhuasi | 龙华寺 | ||||||
| Long'an | 龙安 | ||||||
References
- ^ "成都地铁13号线有最新消息 不止是一条全自动地铁线路" (in Chinese).
- ^ a b "成都2条新建地铁线通过初期运营前安全评估".
线路全长29.07公里,均为地下线。该条线一期设车站21座
- ^ "成都地铁13号线最新消息!" [The latest news on Chengdu Metro Line 13!]. The Paper (in Chinese). 14 December 2020. Retrieved 17 January 2021.
- ^ "成都地铁再上新!首个四线换乘车站揭秘" (in Chinese). 21 December 2022.
- ^ 成都发布 (14 January 2023). "10号线三期、17号线二期、18号线三期……成都轨道交通9条在建线路进展→". Weixin (in Chinese).
- ^ "成都地铁13号线九新区间顺利完成盾构吊装". Sina.com.cn (in Simplified Chinese). 13 January 2023. Retrieved 2 April 2023.
- ^ "成都地铁13号线有最新消息 不止是一条全自动地铁线路" (in Chinese).
- ^ "成都地铁13号、30号线一期正式通车!" (in Chinese). 16 December 2025. Retrieved 16 December 2025.
- ^ "Subway under construction collapses in China's Chengdu, creating sinkhole". Reuters. 21 June 2024.