Line 1 (Dongguan Rail Transit)
| Line 1 | |
|---|---|
| 1 | |
Line 1 train leaving Dongguanxi railway station | |
| Overview | |
| Other name | R1 |
| Status | In operation |
| Locale | Dongguan, Guangdong |
| Termini |
|
| Stations | 25 (Phase 1) |
| Service | |
| Type | Rapid transit |
| System | Dongguan Rail Transit |
| Operator(s) | Dongguan Rail Transit Corporation, Limited (东莞市轨道交通有限公司) |
| History | |
| Opened | 28 November 2025 |
| Technical | |
| Line length | 57.46 km (35.70 mi) (Phase 1)[1][2] |
| Number of tracks | 2 |
| Character | Underground and elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 1 of the Dongguan Rail Transit (Chinese: 东莞轨道交通1号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Yī Hào Xiàn), is a rapid transit line in operation in Dongguan, Guangdong. Phase 1 of Line 1 connects Dongguanxi Railway Station in the North with Meitang in the south.[1][2] It is 57.46 km in length (including 49.44 km underground section).[3]
The Phase 1 of Line 1 in Dongguan started construction in September 2018.[4] The five-station extension to Huangpu New Port station has not yet been approved by National Development and Reform Commission and has no published timeline.
Stations
| Station No. |
Station name | Connections | Distance km |
Location | Section | ||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| Huangpu New Port | 黄埔新港 | 5 | Huangpu (Guangzhou) | Line 1 Extension (long-term planning) | |||
| Dashengcun | 大盛村 | Dongguan | |||||
| Machong Avenue | 麻涌大道 | ||||||
| Machongxi | 麻涌西 | ||||||
| Machongdong | 麻涌东 | ||||||
| 101 | Dongguanxi Railway Station | 东莞西站 | GH SS (Dongguanxi (WGQ)) |
Phase 1 of Line 1[5] | |||
| 102 | Houde | 厚德 | |||||
| 103 | Changping | 昌平 | |||||
| 104 | People's Hospital | 人民医院 | |||||
| 105 | Quhai | 曲海 | |||||
| 106 | Batou | 坝头 | |||||
| 107 | Yuanmei | 元美 | |||||
| 108 | Central Square | 中心广场 | |||||
| 109 | Civic Center[note 1] | 市民中心 | 2 | ||||
| 110 | Lixin | 立新 | |||||
| 111 | Dongchengnan Railway Station | 东城南站 | Dongchengnan (IYQ) GH | ||||
| 112 | Tongsha Park | 同沙公园 | |||||
| 113 | Niushan | 牛山 | |||||
| 114 | Lianping | 连平 | |||||
| 115 | Dalingshan | 大岭山 | |||||
| 116 | Jinju | 金桔 | |||||
| 117 | Guangdong Medical University | 广东医大 | |||||
| 118 | Songshan Lake | 松山湖 | 3 | ||||
| 119 | Songfo | 松佛 | |||||
| 120 | Dalang | 大朗 | |||||
| 121 | Lixiang Park | 荔香公园 | |||||
| 122 | Fengshan | 凤山 | |||||
| 123 | Huangjiang | 黄江 | |||||
| 124 | Huangniupu | 黄牛埔 | |||||
| 125 | Meitang | 梅塘 | 4 | ||||
See also
- Guangzhou Metro
- FMetro
- Shenzhen Metro
- List of rapid transit systems
- Metro systems by annual passenger rides
References
- ^ a b "事关东莞地铁1号线的开通时间、站点、票价……最详细解答来了→".
问:1号线都经过哪些地方?能到达哪些重要区域?答:1号线一期工程西北起于东莞西站,东南止于黄江镇的梅塘站,总长57.46公里,共设25个站点。
- ^ a b "东莞地铁1号线轨道贯通".
东莞轨道交通1号线一期工程起于东莞西站,止于梅塘站,线路总长57.46公里。
- ^ "东莞轨道交通1号线又有新进展!".
东莞轨道交通1号线一期全长约57.46公里,含高架段7.71公里、地下段49.44公里及过渡段0.32公里,沿线设25座车站,高架站与地下站分别为3座和22座
- ^ "Dìngle! Dōngguǎn zhè tiáo dìtiě xiàn, jīnnián 9 yuè zhèngshì dònggōng" 定了!东莞这条地铁线,今年9月正式动工. news.timedg.com (in Chinese). 2018-04-06. Archived from the original on 2018-07-16. Retrieved 2018-07-15.
- ^ "国家发展改革委关于调整东莞市城市轨道交通第二期建设规划方案的批复". 2022-04-22.
1号线一期起于望洪站,终于黄江中心站,全长57.5公里
- ^ "明确了!东莞地铁鸿福路站将更名!1号线全线站名→". 2024-11-04.
External links
- Dongguan Rail Transit – official website Archived 2021-01-28 at the Wayback Machine (in Chinese)