Kandivli West metro station

208
Kandivali (West)

कांदिवली (पश्चिम)
General information
LocationKandivli, Siddhivinayak Nagar, Kandivli West, Mumbai, Maharashtra 400067
Coordinates19°12′51″N 72°50′14″E / 19.21413°N 72.83735°E / 19.21413; 72.83735
Operated by Maha Mumbai Metro Operation Corporation Ltd.
LineLine 2A
Platforms2 side platforms
Construction
Structure typeElevated
ParkingNo
History
Opened2 April 2022 (2022-04-02)
Services
Preceding station Mumbai Metro Following station
Dahanukarwadi Line 2A Shimpoli
Location

Kandivali (West) is an elevated metro station serving the Siddhivinayak Nagar neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1][2][3]

History

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[4] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[5] Kandivli West was opened to the public on 2 April 2022, along with the first phase of Line 2A.[6]

Station layout

2nd Floor Side platform
Platform 1 towards Dahisar (East)
Platform 2 ← towards Andheri (West)
Side platform
1st Floor Mezzanine Fare control, station agent, Metro QR ticket vending machines, crossover
Ground Street level Exit/Entrance

Power and signaling system

Like all other stations and railways of Mumbai metro, Valnai station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

See also

References

  1. ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
  3. ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
  4. ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  5. ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  6. ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.