Hung Shui Kiu station
Proposed station site | |||||||||||
| General information | |||||||||||
| Location | Hung Shui Kiu Yuen Long District, Hong Kong | ||||||||||
| Coordinates | 22°25′55″N 113°59′18″E / 22.4319°N 113.9884°E | ||||||||||
| System | Under construction MTR rapid transit station (Project gazetted, construction began 2024) | ||||||||||
| Owned by | KCR Corporation | ||||||||||
| Operated by | MTR Corporation | ||||||||||
| Line | Tuen Ma line | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Other information | |||||||||||
| Status | Approved, construction began 2024 | ||||||||||
| Station code | HSK | ||||||||||
| History | |||||||||||
| Opening | 2030[1] | ||||||||||
| Key dates | |||||||||||
| 2021 | Planning and design commences | ||||||||||
| 2023 | Project gazetted under the Railway Ordinance[2] | ||||||||||
| 2024 | Expected commencement of construction | ||||||||||
| 2030 | Expected completion of construction | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Hung Shui Kiu (Chinese: 洪水橋) is an under construction MTR station on the Tuen Ma line. It will be located at Hung Shui Kiu, Yuen Long.
It is expected to cost HK$4.1 billion in December 2018 prices.[3]
The station may also be served by the proposed Hong Kong-Shenzhen Airport Rail Link between Hong Kong International Airport, Shenzhen Bao'an International Airport, Guangzhou Baiyun International Airport and Foshan Shadi Airport.[4]
In March 2024, the Executive Council of Hong Kong approved the construction of the station.[5] The station is expected to be finished by 2030.
References
- ^ 鍾妍 (4 June 2021). "港鐵洪水橋站遲6年建成 陳帆暗指41億「招呼」4,000人欠效率". 香港01 (in Chinese (Hong Kong)). Retrieved 12 May 2022.
- ^ "Addition of railway station at Hung Shui Kiu gazetted" (Press release). The Government of the Hong Kong Special Administrative Region. 24 February 2023.
- ^ 2023 Interim Results (PDF) (Report). MTR Corporation. 10 August 2023. p. 12. Retrieved 23 August 2023.
- ^ SZ, HK airport rail route set
- ^ Standard, The. "ExCo approves the Hung Shui Kiu MTR station project, expected to be completed in 2030". The Standard. Retrieved 29 March 2024.