Guangqumen Wai station
Platform | |||||||||||||||||||||
| General information | |||||||||||||||||||||
| Location | Guangqumen Outer Street and Guangheli Middle Street (广和里中街) / Guangqumenbei 4th Alley (广渠门北四巷) Dongcheng District / Chaoyang District border, Beijing China | ||||||||||||||||||||
| Coordinates | 39°53′36″N 116°26′50″E / 39.8934°N 116.4472°E | ||||||||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||||||||||||
| Lines | |||||||||||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||||||||||
| Tracks | 2 | ||||||||||||||||||||
| Construction | |||||||||||||||||||||
| Structure type | Underground | ||||||||||||||||||||
| Accessible | Yes | ||||||||||||||||||||
| History | |||||||||||||||||||||
| Opened | December 28, 2014 | ||||||||||||||||||||
| Services | |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
Guangqumen Wai station[1] (simplified Chinese: 广渠门外站; traditional Chinese: 廣渠門外站; pinyin: Guǎngqúmén Wài Zhàn) is a station on Line 7 of the Beijing Subway.
Timetable
- Beijing West Railway Station — Universal Resort
- The first train 5:50
- The last train 23:35
- Universal Resort — Beijing West Railway Station
- The first train 5:33
- The last train 22:48[2]
Station layout
The station has an underground island platform.
History
Line 7
The station was opened on December 28, 2014 as a part of the stretch between Beijing West railway station and Jiaohuachang and is located between Guangqumennei to the west and Shuangjing to the east.[3]
Line 17
Line 17 station and the Majuan Public Transport Hub (马圈交通枢纽) will be completed in June 2026.[4] If Line 17 station opens earlier in late 2025, transfer between Lines 7 and 17 will be out-of-system transfer.
Exits
Line 7
There are 3 exits, lettered A, B, and D. Exit B is accessible via a stairlift.
Line 17
There are 3 exits, lettered F1, F2, and G.
Gallery
-
Concourse
References
- ^ "Jpg格式线路图下载 | 北京地铁官方网站".
- ^ "Station Information". Beijing subway.
- ^ "Beijing opens four new subway lines". Xinhua. Retrieved 28 December 2014.
- ^ "临时用地审批情况公示(地铁17号线广渠门外站与马圈地块一体化项目地铁工程施工项目)". 2025-07-08.