Gour Express

Sealdah Junction - Malda Town
Gour Express
Overview
Service typeExpress
LocaleWest Bengal & Jharkhand
First serviceApril 1980, 20 (20-04-1980)
Current operatorEastern Railway
Route
TerminiSealdah (SDAH)
Malda Town (MLDT)
Stops12
Distance travelled349 km (217 mi)
Average journey time8 hours in up direction, 7 hours 15 minutes in down direction.
Service frequencyDaily
Train number13153/13154 (to Malda Town)
On-board services
ClassesFirst AC, Second AC, Third AC, Sleeper, Unreserved
Seating arrangementsAvailable
Sleeping arrangementsAvailable
Auto-rack arrangementsAvailable
Observation facilitiesLarge windows
Baggage facilitiesAvailable
Technical
Rolling stockLHB coach
Track gauge1,676 mm (5 ft 6 in)
Operating speed44 km/h (27 mph) average with halts

Gour Express is an express train of the Indian Railways connecting the district of Kolkata with the district of Malda. The train covers a distance of 347.3 km (216 mi) up to Malda and back to Sealdah , Kolkata with the numbers 13153/54.

Timeline

The Gour Express commenced operations as a triweekly express service between Sealdah and Malda from 20 April 1980. The train proved successful and the then railway minister A. B. A. Ghani Khan Choudhury played a key role in increasing the frequency of the service. On 2 October 1982, he flagged off the first run of the train as a daily service.

Important stoppages

Note: Bold letters indicates Major Railway Stations/Major Cities.

Routeing & Halts

Station code Station name

13153[1]

Distance
from source
in km
Day

13154[2]

Distance
from source
in km
Day
Arrival Departure Arrival Departure
SDAH Sealdah Source 22:05 0 1 04:40 Destination 347.3 2
NH Naihati Junction 22:50 22:53 38.1 1 03:34 03:36 309.2 2
BDC Bandel Junction 23:30 23:35 46.5 1 02:46 02:50 300.2 2
BWN Barddhaman Junction 00:50 00:55 113.9 2 01:41 01:46 233.4 2
BHP Bolpur Shantiniketan 01:42 01:44 165.3 2 00:41 00:43 182 2
RPH Rampurhat Junction 02:57 03:02 225.8 2 00:01 00:06 121.5 2
NHT Nalhati Junction 03:15 03:17 239.9 2 23:34 23:36 107.3 1
MRR Murarai 03:32 03:34 256.0 2 23:18 23:19 91.2 1
RJG Rajgram --- --- 267.7 2 23:02 23:03 79.5 1
PKR Pakur 03:56 03:58 279:2 2 22:46 22:48 68 1
NFK New Farakka Junction 04:48 04:53 312.7 2 21:47 21:52 34.6 1
MLDT Malda Town 6:05 Destination 347.3 2 Source 21:25 0 1

Timings

  1. 13153 leaves Sealdah around 22:05 everyday and reaches Malda Town at 6:05 next day.
  2. 13154 departs Malda Town around 21:25 everyday and reaches Sealdah at 4:40 next day.

Coach composition

The train consists of 21 passenger coaches. The train runs with the following coach composition -

  • 1 Composite 1st A/C
  • 3 A/C 2-tier coaches
  • 2 A/C 3-tier coaches
  • 9 Non-A/C sleeper coaches
  • 4 Unreserved sleeper coaches (UR)
  • 1 Luggage-cum-Guard coaches with unreserved seating (SLR)
  • 1 End on Generation (EOG)

Of these, one Luggage-cum-Guard, one unreserved sleeper, three reserved non-A/C sleeper, one A/C 3-tier and one A/C 2-tier coach were used for the through service between Sealdah and Balurghat (now closed).[3]

Traction

As the route from Sealdah to Malda is fully electrified, it is hauled by a Howrah/Sealdah-based WAP-4/WAP-7 throughout its entire journey.

See also

References

  1. ^ "13153/Gour Express- Sealdah Junction to Malda Town ER/ Eastern Zone - Railway Enquiry".
  2. ^ "13154/Gour Express- Malda Town to Sealdah Junction ER/ Eastern Zone - Railway Enquiry".