National Exhibition and Convention Center station

National Exhibition and Convention Center

国家会展中心
Concourse of the Line 17 station
Chinese name
Simplified Chinese国家会展中心
Traditional Chinese國家會展中心
Transcriptions
Standard Mandarin
Hanyu PinyinGuójiā huìzhǎn zhōngxīn
General information
Other names
  • China Exposition North (Line 17 planning name)
  • East Xujing (Line 2 former name)
  • Zhuguang Road (Line 17 former name)
LocationQingpu District, Shanghai
China
Coordinates31°11′26″N 121°17′43″E / 31.190556°N 121.295278°E / 31.190556; 121.295278
Operated byShanghai No. 2 Metro Operation Co. Ltd.
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened16 March 2010 (2010-03-16) (Line 2)
30 December 2017 (2017-12-30) (Line 17)
Services
Preceding station Shanghai Metro Following station
Panxiang Road · Shanghai National Accounting Institute
Terminus
Line 2 Hongqiao Railway Station
Panlong Road
towards Xicen
Line 17 Hongqiao Railway Station
Terminus
Future services
Terminus Line 13 Yunle Road
towards Dangui Road
Location
National Exhibition and Convention Center
Location in Shanghai

National Exhibition and Convention Center (Chinese: 国家会展中心; pinyin: Guójiā Huìzhǎn Zhōngxīn) is a station on Line 2 and Line 17 of the Shanghai Metro, located at the Shanghai National Exhibition and Convention Center. The station opened on 16 March 2010 as East Xujing on Line 2, and opened on 30 December 2017 as Zhuguang Road on Line 17. Both stations were merged on 21 September 2024.[1] Because of this station's proximity to its namesake, large crowds often appear when expos such as the China International Import Expo are held there.[2][3] The station is located in Xujing Town, Qingpu District, Shanghai.

History

The Line 17 station opened for passenger trials on 30 December 2017, alongside the rest of the first section of the line. During the planning and construction stages, the station was named China Exposition North (simplified Chinese: 中国博览会北; traditional Chinese: 中國博覽會北; pinyin: Zhōngguó Bólǎnhuì běi), because it is located north of the National Convention and Exhibition Center.[4]

Station description

On Line 2, the first train is at 05:30, and the last train is at 23:30. The ride from here to Pudong Airport takes approximately 90 minutes. Although both the Line 2 and the Line 17 station have the same name and are officially considered one station, they are not treated as one when calculating transfer fares. However, this will change with the opening of the Line 13 extension in 2026. Passengers wishing to transfer between Line 17 and Line 2 can transfer at Hongqiao Railway Station, which is one stop to the east.[5]

Line 2

The Line 2 station concourse is located on the first underground level and is arranged in an east-west direction. The paid area is located in the centre of the concourse, with entrance turnstiles on the north side and exit turnstiles on the south side. A long passageway is located to the west of the concourse, leading to exits 6, 8, and 9.

Line 17

Like all stations on Line 17, National Exhibition and Convention Center station is fully accessible. The platform area consists of a single island platform located underground, beneath a concourse level, which has two service counters, one at each end. There are fare controls at both the west and east ends of the concourse level. The platform area can be accessed by elevator from the concourse area within the fare-paid zone. The street level and concourse level are connected by an elevator near Exit 3, at the western end of the station. Toilets are located at the platform level within the fare-paid zone, at the east end of the platform.[6]

The station itself is located in the eastern part of Qingpu District, beneath the Songze Elevated Road along Songze Avenue, between Zhuguang Road and Panxiu Road. The station is located very close to the boundary with Minhang District.[7]

The Line 17 station is known for its design elements. An 88-metre (289 ft) long mural fills the entire length of the concourse. Although an underground station, sunshine flows easily to the platform level via a panoramic sunroof, which covers the entire ceiling. The single island platform is 23 metres (75 ft) wide, and unlike other island platforms, there are no support columns along the middle of the platform. These columns were instead placed between the platform and the tracks, also serving as pilasters for the platform screen doors.[8] Porcelain art pieces are on display between the platform screen doors.[9]

In July 2018 the Line 17 station won the LEED (Leadership in Energy and Environmental Design) silver prize, the most widely used green building rating system in the world, making it the first of all Metro stations in Asia to win the title.[10]

Exits

This station has 11 exits. As the two lines that currently stop here have separate concourses, each exit leads to a single line. Exits 2-6, 8-9, and 13-14 (formerly East Xujing Station) lead to Line 2, while exits 15-16 (formerly exits 2 and 3 of Zhuguang Road Station) lead to Line 17. Originally, the Line 2 station had four additional exits, numbered 1, 2, 14 and 15. These were demolished after the construction of the National Exhibition and Convention Center and rebuilt as the current Exits 2 and 14. The accessible lift at the former exit 15 has been retained but is currently not open to the public.

Line 2
Line 17
  • Exit 15: Zhuguang Road
  • Exit 16: Panxiu Road [6]

Nearby landmarks

The station is located just northwest of the National Convention and Exhibition Center, which was the venue for the China International Import Expo in November 2018. Even though both the Line 2 and Line 17 stations share the same name, the station is currently not considered an interchange station. However this will change with the opening of the Line 13 extension in 2026. Passengers wishing to interchange to Line 2 from Line 17 can make their way to Hongqiao Railway Station, which is one stop to the east.[7]

References

  1. ^ "新版上海轨道交通网络图正在逐步更换 9站更名 图例调整 最新信息建议查看电子版" [The new version of Shanghai Rail Transit Network Map is being gradually replaced. 9 stations are renamed and the legend is adjusted. It is recommended to view the electronic version for the latest information] (in Simplified Chinese). Retrieved 2024-12-01.
  2. ^ "进博会期间客流量远超平时,地铁徐泾东站将采取单向循环通行". 澎湃新闻. 2018-10-30. Archived from the original on 2022-06-12. Retrieved 2020-01-29.
  3. ^ "轨交二号线徐泾东站今早迎来首个进博会大客流,警方全力疏导". 文汇报. 2019-11-06. Archived from the original on 2020-08-02. Retrieved 2020-01-29.
  4. ^ "上海地铁17号线中国博览会北站建设最新进展". Bendibao.com (in Chinese (China)). Retrieved 2017-12-28.
  5. ^ "Zhuguang Road". OpenStreetMap. Retrieved 2017-12-28.
  6. ^ a b "车站信息". Shanghai Shentong Metro Group (in Chinese (China)). Retrieved 2017-12-28.
  7. ^ a b "Zhuguang Road". OpenStreetMap. Retrieved 2017-12-28.
  8. ^ "A first look at innovation-savvy Shanghai Metro Line 17". Xinhuanet. 2017-12-22. Archived from the original on December 25, 2017. Retrieved 2017-12-30.
  9. ^ 申窑艺术家瓷艺作品进驻青浦地铁17号线诸光路站. Artron (in Chinese). 2017-12-08. Retrieved 2017-12-30.
  10. ^ Shanghai Metro: from nothing to world leader