Bikaner–Puri Express

Shri Ganganagar-Puri Express
Overview
Service typeSuperfast
First service28 April 2013 (2013-04-28)
Current operatorNorth Western Railway
Route
TerminiShri Ganganagar Junction (SGNR)
Puri (PURI)
Stops37
Distance travelled2,407 km (1,496 mi)
Average journey time43 hrs 20 mins
Service frequencyWeekly
Train number20471 / 20472
On-board services
ClassesAC 2 Tier, AC 3 Tier, Sleeper Class, General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesE-catering,
On-board Catering
Observation facilitiesLarge windows
Baggage facilitiesNo
Other facilitiesBelow the seats
Technical
Rolling stockLHB coach
Track gauge1,676 mm (5 ft 6 in)
Operating speed56 km/h (35 mph) average including halts.

The 20471 / 20472 Shri Ganganagar-Puri Express is a superfast express train of the Indian Railways connecting Shri Ganganagar in Rajasthan and Puri in Odisha. It is currently being operated with 20471/20472 train numbers on a weekly basis.

Service

  • 20471 Shri Ganganagar - Puri Express has an average speed of 56 km/h and covers 2407 km in 43 hrs 20 mins.
  • 20472 Puri - Shri Ganganagar Express has an average speed of 55 km/h and covers 2407 km in 43 hrs 50 mins.

Route and halts

The important halts of the train are :

Traction

As the route is fully electrified, it is hauled by a Visakhapatnam Loco Shed-based WAP-7 electric locomotive From Shri Ganganagar to Puri and vice versa.

Coach composite

The train consists of 20 LHB coaches:

  • 1 AC II Tier
  • 6 AC III Tier
  • 2 AC III Tier Economy
  • 5 Sleeper Coaches
  • 4 General
  • 2 SLR cum EoG/parcel van

Direction reversal

Train Reverses its direction twice at:

See also

References