Acquisition of railways by the Lower Silesian Voivodeship
The acquisition of railways by the Lower Silesian Voivodeship marshal's office involves the gradual, paid or unpaid transfer of railway lines previously managed by PKP Polskie Linie Kolejowe to the ownership of the Lower Silesian Voivodeship. By the end of 2022, 23 lines spanning approximately 240 km were acquired, with passenger services restored on five sections.[1] The Lower Silesian Voivodeship is the only region in Poland systematically acquiring railway infrastructure.[2] The infrastructure is managed by the Lower Silesian Roads and Railways Service in Wrocław.[1] The acquired lines are operated by Koleje Dolnośląskie.[3]
Legal framework
The organization of regional transport is the responsibility of voivodeship marshals. Under Polish law, local government units may acquire railway lines that are not critical to the national railway network and serve only local purposes. Typically, these are lines with no or minimal train operations. Acquisition can be paid or unpaid.[1] The process is governed by Article 39 of the Act on the Restructuring, Commercialization, and Privatization of the Polish State Railways, dated 8 September 2000.[4]
Regional railway characteristics
The Lower Silesian Voivodeship has a high rate of railway usage for local and regional transport. In 2018, the average resident made 9.4 rail trips annually, the 4th-highest in Poland.[5] Regional and agglomeration services accounted for 88% of trips, with most occurring in the Wrocław metropolitan area. Two operators serve the region: Polregio and the voivodeship-owned Koleje Dolnośląskie, which is gradually displacing other operators in regional and local transport.[5]
The voivodeship's policy focuses on restoring lost connections and expanding local services.[6] Major obstacles include ongoing renovations and insufficient track capacity.[7]
Compared to other Polish regions, Lower Silesia historically had the densest railway network, serving all cities until 1945, though the Eulengebirgsbahn declined in the 1930s.[5] Post-war years saw the closure of lines deemed unprofitable. By 1989, 277 km of lines were closed, yet the region's railway network density remained the highest in Poland at 12.4 km per 100 km². By 2009, this dropped to 8.8 km per 100 km² after an additional 700 km of lines were closed since 1990.[8]
History
The 1990s saw widespread closures of unprofitable railway lines in Lower Silesia, which had a dense network. By 2000, around 40 local lines, such as Malczyce–Jawor, Wrocław Psie Pole–Trzebnica, and Dzierżoniów Śląski–Bielawa Zachodnia, were closed. These closures primarily affected small towns distant from major centers, exacerbating transport exclusion in Poland. Key reasons included deteriorating infrastructure and declining demand.[2][9][10]
The first regional initiative to introduce local transport on Polish State Railways' infrastructure was the establishment of Lubuska Kolej Regionalna in 1991.[11] The first attempt at railway line acquisition occurred in 2001 in Hajnówka County, where the county head planned to take over a section of Lewki–Białowieża railway from Hajnówka to Białowieża.[4]
The first line acquired by the Lower Silesian Voivodeship was Wrocław Psie Pole–Trzebnica railway. Acquisition efforts began in 2007, and after a nine-month renovation, the line was reopened in 2009.[12][13] The line became popular and overcrowded, leading to plans in 2022 for electrification and the construction of a passing loop.[14]
In 2022, the Kolej Plus program was launched to support railway transport with government funds. The voivodeship submitted four projects, but the revitalization of the Kobierzyce–Piława Górna line, aimed at improving connectivity with Ząbkowice County, was rejected.[15]
PKP Polskie Linie Kolejowe has been reluctant to transfer assets, leading to procedural disputes. In Lubusz Voivodeship, on Wolsztyn–Krzyż Rudno railway, only embankments were transferred without tracks, which were dismantled for planned bike paths. The transfer of the Dzierżoniów–Bielawa section was delayed but completed by 2022. Declaring intent to acquire a line prevents the Polish State Railways from dismantling it.[16]
Acquired railway lines
As of 28 March 2024, the voivodeship has acquired the following railway lines:[17]
| Line number | Section | Kilometer range | Status |
|---|---|---|---|
| 283 | Jelenia Góra – Lwówek Śląski[18] | km 2.140 to km 33.316 |
Out of service |
| 284 | Jerzmanice-Zdrój – Lwówek Śląski | km 24.444 to km 48.157 |
Out of service |
| 291 | Szczawno-Zdrój – Sobięcin | km 3.400 to km 17.140 |
Out of service |
| 302 | Strzegom – Marciszów | km 44.835 to km 73.040 |
Out of service |
| 303 | Duninów – Przemków Odlewnia | km 7.880 to km 31.100 (10.970) | Partially active[3][19] |
| 308 | Pisarzowice – Jelenia Góra | km 7.945 to km 37.818 | Under construction[20] |
| 310 | Kobierzyce – Piława Górna | km 0.174 to km 38.645 | Under construction[21] |
| 311 | Szklarska Poręba Górna – State Border | km 29.844 to km 43.138 |
In service[3] |
| 312 | Wojcieszów – Nowy Kościół | km 16.090 to km 33.430 |
Out of service |
| 316 | Chojnów – Rokitki | km 21.832 to km 26.755 |
In service |
| 317 | Gryfów Śląski – Świeradów-Zdrój | km 0.668 to km 16.544 |
In service[22] |
| 327 | Srebrna Góra – Bielawa Zachodnia | km 12.380 to km 28.295 | Under construction[23] |
| 304 | Kondratowice – Łagiewniki Dzierżoniowskie | km 46.200 to km 51.139 |
Out of service |
| 320 | Ciepłowody – Ciepłowody | km 9.982 to km 13.282 |
Out of service |
| 322 | Kłodzko Nowe – Stronie Śląskie[18] | km 9.700 to km 24.622 | Tender issued |
| 323 | Nowa Wieś Grodziska – Nowa Wieś Grodziska | km 0.303 to km 2.065 |
Out of service |
| 326 | Wrocław Zakrzów – Trzebnica | km 1.260 to km 19.903 |
In service[3] |
| 327 | Ścinawka Średnia – Radków | km 6.248 to km 14.255 |
Out of service |
| 327 | Wolibórz – Nowa Ruda Słupiec | km –5.380 to km 0.000 |
Out of service |
| 331 | Roztoka – Roztoka | km 13.332 to km 14.638 |
Out of service |
| 335 | Henryków – Ciepłowody | km –0.279 to km 10.080 |
Out of service |
| 340 | Mysłakowice – Karpacz | km –0.247 to km 7.055 | Under construction[24] |
| 341 | Bielawa Zachodnia – Dzierżoniów | km –0.530 to km 5.118 |
In service[3] |
| 345 | Kamienna Góra – Pisarzowice | km 1.780 to km 3.040 | Tender issued[25] |
| 372 | Bojanowo – Góra Śląska | km 0.600 to km 15.305 |
Out of service |
Duninów–Przemków Odlewnia railway
Rokitki–Chocianów railway from Rokitki to Niegosławice was operational since 1890 but began deteriorating in the 1990s. Passenger services on the Chocianów–Niegosławice section ceased in 1991, followed by freight services on the Przemków Odlewnia–Niegosławice section in 1994.[26] In 2000, passenger services on the Rokitki–Chocianów section and freight services on the Chocianów–Przemków Odlewnia section were discontinued. By 2005, the final freight section from Duninów to Chocianów was closed, leaving only a 6 km freight section from Rokitki to Duninów for the 4th Regional Logistics Base.[26]
On 24 January 2019, the voivodeship approved the acquisition of the Duninów–Chocianów section,[27] formalized on 16 December 2020.[28] Renovation took 14 months,[29] and passenger services resumed on 11 December 2022 with the Legnica–Chocianów route.[30]
In December 2023, the Chocianów–Przemków Odlewnia section was acquired,[31] with track clearing starting soon after. Passenger services to Przemków are planned for late 2025, with further revitalization of the Przemków Odlewnia–Niegosławice section targeted for the 2026/2027 timetable to enable Legnica–Głogów connections via Przemków, Niegosławice, Gaworzyce, and Żukowice.[32] A tender for the Chocianów–Przemków Odlewnia section was announced on 14 March 2025.[33]
Kobierzyce–Piława Górna railway
Kobierzyce–Piława Górna railway connects Kobierzyce to Piława Górna on the Sudeten line, linking Wrocław with Ząbkowice County. Passenger services ceased in 1996, and all rail traffic stopped a few years later. In 2019, the voivodeship acquired the railway from the Polish State Railways.[34] An attempt to include the railway in the Kolej Plus program for renovation by PKP Polskie Linie Kolejowe failed in April 2022.[15] Nevertheless, the voivodeship proceeded, announcing a tender in December 2022 for works between Łagiewniki Dzierżoniowskie and Piława Górna.[21] The tender required increasing the maximum passenger train speed to 80 km/h, meeting third-class railway standards, and upgrading level crossings with signaling. Plans included rebuilding the Łagiewniki Dzierżoniowskie, Niemcza, Wilków, and Przerzeczyn railway stations, and adding a new stop in Niemcza. Completion was initially set for 31 May 2024, but works were delayed.[34]
The Łagiewniki–Piława Górna section was expected to be operational by December 2024, with the Kobierzyce–Łagiewniki section planned for the 2025/2026 timetable.[35]
Szklarska Poręba Górna–State Border railway
The Szklarska Poręba Górna–State Border section is a 13 km non-electrified segment of Izera railway, running through the Jizera Mountains. Until 1945, it was electrified, but the German traction network was dismantled by the Red Army and taken to the Soviet Union as war reparations under an 8 July 1945 agreement.[36] Passenger services on the Szklarska Poręba Huta–State Border section were suspended in 1947, and on the Szklarska Poręba Górna–Szklarska Poręba Huta section in 1957.[37]
Renovation began ceremonially on 8 May 2009, extending from Szklarska Poręba to the Polish border and onward to Kořenov.[38][39] The Wrocław-based firm Dolkom S.A. undertook the work, estimated at 14 million PLN. Originally planned for completion by 30 November 2009, delays due to a harsh winter pushed completion to mid-June 2010. The line was ceremonially reopened on 2 July 2010, with regular services (initially to Jakuszyce) starting the next day. In 2010, the timetable included six daily round trips between Kořenov and Szklarska Poręba Górna.[40]
Chojnów–Rokitki railway
The 8 km section of Chojnów–Rokitki railway from Chojnów to Rokitki was active from 1906 to 2002.[41] The Lower Silesian Voivodeship Marshal's Office repeatedly sought to acquire this section from PKP Polskie Linie Kolejowe. In 2014, the line was slated for dismantling, but this was averted.[42]
On 24 January 2019, the voivodeship approved the acquisition of the Chojnów–Rokitki section, excluding short segments at the Chojnów and Rokitki stations,[27] formalized on 29 April 2019.[43] Revitalization works took place between 2021 and 2022, and passenger services resumed on 11 December 2022 with the Legnica–Chocianów route.[44]
Gryfów Śląski–Świeradów-Zdrój railway
The railway from Gryfów Śląski to Świeradów-Zdrój was originally divided into two railways: Legnica–Jerzmanice-Zdrój railway for the Gryfów Śląski–Mirsk section and Mirsk–Świeradów Nadleśnictwo railway for Mirsk–Świeradów-Zdrój Nadleśnictwo. Until 1945, it was known as the Izera Mountains Railway due to its route near the Zajęcznik peak. Passenger services from Gryfów Śląski to Mirsk began in 1884, extended to Świeradów-Zdrój in 1909.[45] Passenger services ceased on 11 February 1996, and freight services ended in 1998. In 1999, the Gryfów Śląski–Mirsk section was redesignated as Gryfów Śląski–Świeradów-Zdrój railway.[46]
Revitalization took approximately 18 months, costing 60 million PLN, with contributions of 5 million PLN from Świeradów-Zdrój and 1 million PLN each from Mirsk and Gryfów Śląski. The railway was ceremonially reopened on 7 December 2023, with passenger services starting on 10 December.[47] Critics argued the railway would be unprofitable, favoring a bike path instead. However, Koleje Dolnośląskie reported over 6,000 passengers in December 2023 and 6,640 in January 2024, averaging about 200 daily passengers.[47]
Kłodzko Nowe–Stronie Śląskie railway
The railway from Kłodzko to Stronie Śląskie, opened in 1897, operated passenger services until 2004 and freight services until 2007 on the Ołdrzychowice OMYA–Stronie Śląskie section.[48]
Acquisition efforts by Lower Silesian Roads and Railways Service faced ownership issues,[49] resolved on 14 September 2023, when the railway was taken under 30-year management with an option for permanent acquisition.[18]
Pending acquisition, Koleje Dolnośląskie launched a temporary bus service in September 2022 between Kłodzko and Stronie Śląskie, integrated into the train timetable.[50] In 2024, the voivodeship announced plans to resume rail services to Stronie Śląskie in 2026.[51] A tender for revitalization was issued on 29 January 2025.[52]
Wrocław Zakrzów–Trzebnica railway
The 19 km Wrocław Zakrzów–Trzebnica section of Wrocław Psie Pole–Trzebnica railway, within the Wrocław metropolitan area, connects Wrocław to Trzebnica. Opened in 1886, it operated passenger services until 1991 and freight until 1999, except for the Wrocław Psie Pole–Wrocław Zakrzów section, which remained with PKP Polskie Linie Kolejowe.[53]
In 2007, the voivodeship acquired the railway from PKP Polskie Linie Kolejowe and began revitalization. Passenger services resumed on 20 September 2009.[54] In 2024, plans were made for a passing loop and electrification funding was secured.[55]
Kamienna Góra–Jelenia Góra and Mysłakowice–Karpacz railways
The railway to Karpacz and Kowary operated from 1895 to 1986 for Kowary and until 2000 for Karpacz. Pre-war electrification was dismantled in 1945 by Soviet forces south of the Wałbrzych–Jelenia Góra railway. A 2020 feasibility study for Opole Wschodnie–Opole Port railway, Kamienna Góra–Jelenia Góra railway, and Mysłakowice–Karpacz railway included re-electrification, later abandoned. These railways were acquired on 8 June 2021.[56] Renovation began with the Jelenia Góra–Mysłakowice section, funded by the Polish Deal program, with Infrakol from Jawor as the contractor. Works involved removing 3,800 trees, dismantling old tracks, and replacing ballast. Plans remain for the Mysłakowice–Ogorzelec–Pisarzowice–Kamienna Góra section. Kowary secured 4.5 million PLN from the Polish Deal for station renovation, including a tourist information center, the Kowary Craft Museum, and a library.[56]
A tender for preparatory works on the Mysłakowice–Karpacz railway was issued on 15 December 2022,[57] receiving 11 bids.[58] Construction began in March 2023.[24]
Srebrna Góra–Bielawa–Dzierżoniów Śląski railway
The Dzierżoniów Śląski–Bielawa Zachodnia railway from Dzierżoniów to Bielawa was acquired by the voivodeship in late 2017. Passenger services were intermittently suspended from 26 May 1962, ceasing permanently on 21 May 1977, with freight services ending in 2001.[59] Within 100 days, a tender was issued for revitalization, with a contract signed on 22 March 2018. Works included track resurfacing, upgrading four level crossings, and modernizing the Bielawa Centralna and Bielawa Zachodnia railway stations.[60] The 5 km section cost 15 million PLN.[61] Despite a planned September 2019 reopening,[60] passenger services resumed on 15 December 2019,[62] costing 14 million PLN.[63] A small protest occurred at the opening due to the closure of an unauthorized crossing.[62]
The Bielawa Zachodnia–Srebrna Góra railway operated passenger services until 1977 and freight until 1987. In May 2021, Lower Silesian Roads and Railways Service issued a tender for design and preparatory works.[64] In April 2024, a tender was announced for revitalizing the Nowa Bielawa–Bielawa Zachodnia section, including a new Bielawa Camping Sudety station.[23] Works began in early 2025.[65] A tender for the remaining Srebrna Góra section was issued on 28 January 2025.[66]
Supreme Audit Office's report
In January 2022, the Supreme Audit Office released a report, Activities of the Lower Silesian Voivodeship Government to Restore Railway Connections. It criticized the restoration of passenger services on only three of the 23 acquired railways, covering 37.6 km, and highlighted high acquisition costs of 8.196 million PLN annually. The report estimated a 52-year timeline for full reactivation at the current pace, citing a lack of profitability analysis and inadequate consideration of residents' needs.[1] The Supreme Audit Office recommended agreements with PKP Polskie Linie Kolejowe for revitalized railways and urged the Ministry of Infrastructure to conduct a comprehensive transport plan analysis.[67]
Lower Silesian officials labeled the report "nonsense", accusing the Supreme Audit Office of unreliable data analysis, ignoring ongoing works on 50 km of railways within 1–3 years of acquisition, the severe degradation of the region's railway infrastructure, and the limited funding for Koleje Dolnośląskie.[67][68]
Challenges
Acquisition faces obstacles. The Kłodzko Nowe–Stronie Śląskie railway has complex ownership, split between Polish State Railways and PKP Polskie Linie Kolejowe, requiring lengthy legal processes. An interpellation by MP Monika Wielichowska was ineffective, but the issue was resolved with the railway's 30-year management transfer on 14 September 2023.[18] Similar issues affect the Jelenia Góra–Lwówek Śląski railway, exacerbated by the poor condition of the Pilchowice Lake railway bridge.[14]
See also
References
- ^ a b c d "Koleje na Dolnym Śląsku – Niewielka Reaktywacja" [Railways in Lower Silesia – A Modest Revival]. nik.gov.pl (in Polish). 5 January 2022. Retrieved 2025-06-09.
- ^ a b Szymański, Sławek (26 February 2022). "Czy Warto Remontować Lokalne Linie Kolejowe i Przywracać na Nich Ruch Pasażerski?" [Is It Worth Renovating Local Railway Lines and Restoring Passenger Traffic on Them?]. Gazeta Wyborcza (in Polish). Retrieved 2025-06-09.
- ^ a b c d e Dolnośląski Rozkład Jazdy [Lower Silesian Timetable] (in Polish). Legnica: Koleje Dolnośląskie. 2022. pp. 88–96.
- ^ a b Czepe, Roman. "Interpelacja nr 4677 do Ministra Transportu w Sprawie Przejmowania przez Gminy i Powiaty Infrastruktury Kolejowej" [Interpellation No. 4677 to the Minister of Transport Regarding the Acquisition of Railway Infrastructure by Municipalities and Counties]. orka2.sejm.gov.pl (in Polish). Retrieved 2025-06-09.
- ^ a b c Smolarski, Mateusz. "Problematyka Przejmowania Infrastruktury Kolejowej przez Samorząd Terytorialny – Przykład Województwa Dolnośląskiego" [Issues of Railway Infrastructure Acquisition by Local Government – The Case of Lower Silesian Voivodeship]. Prace Komisji Geografii Komunikacji PTG (in Polish). pp. 83–93. Retrieved 2025-06-09.
- ^ Śmietana, Krzysztof (14 January 2019). "Regionalna Kolej Ożywa. Po Latach Likwidowania Lokalnych Linii Czas na Ich Przywracanie" [Regional Railways Are Reviving. After Years of Closing Local Lines, It's Time to Restore Them]. forsal.pl (in Polish). Retrieved 2025-06-09.
- ^ "Kolej w Województwach – Wykorzystanie i Polityka Transportowa" [Railways in Voivodeships – Usage and Transport Policy] (PDF). Urząd Transportu Kolejowego (in Polish). pp. 20–21. Archived from the original (PDF) on 2024-02-20. Retrieved 2025-06-09.
- ^ Wiszewska, Barbara; Szmytkie, Robert (2015). "Likwidacja Kolei na Dolnym Śląsku a Zmiany w Strukturze Funkcjonalno-Przestrzennej Miast" [Railway Closures in Lower Silesia and Changes in the Functional-Spatial Structure of Cities] (PDF). Studia miejskie (in Polish). Retrieved 2025-06-09.
- ^ Kalińska, Agata. "Polska Kolej się Kurczy. Inne Kraje Już to Przerabiały. I Wiedzą, że to Błąd" [Polish Railways Are Shrinking. Other Countries Have Been Through This and Know It's a Mistake]. Money.pl (in Polish). Retrieved 2025-06-09.
- ^ Orliński, Wojciech (2 September 2019). ""Wygaszanie Popytu", Czyli Jak Likwiduje się Polską Kolej" ["Demand Suppression", or How Polish Railways Are Being Dismantled]. Gazeta Wyborcza (in Polish). Retrieved 2025-06-09.
- ^ Jerczyński, Michał (2007). "Kolejka Karkonoska" [Karkonosze Railway]. Świat kolei (in Polish). 7. Łódź: EMI-PRESS: 28. ISSN 1234-5962.
- ^ Gabińska, Anna; Żabiński, Ryszard (20–21 October 2007). "Trzebnica: Samorząd Przejął Linię Kolejową" [Trzebnica: Local Government Took Over the Railway Line]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "Z Wrocławia do Trzebnicy Szynobusem" [From Wrocław to Trzebnica by Railbus]. wroclaw.naszemiasto.pl (in Polish). 19 September 2008. Retrieved 2025-06-09.
- ^ a b Kokoszkiewicz, Mateusz (15 December 2022). "Dolny Śląsk Chce Wyremontować Linie Kolejowe za Pieniądze z UE. Gdzie na Nowo Pojadą Pociągi?" [Lower Silesia Wants to Renovate Railway Lines with EU Funds. Where Will Trains Run Again?]. Gazeta Wyborcza (in Polish). Retrieved 2025-06-09.
- ^ a b Izydorek, Adrian (30 April 2022). "Odrzucono 13 Projektów z Programu Kolej Plus. Dokumentacja do Nich Kosztowała Miliony" [13 Kolej Plus Projects Rejected. Their Documentation Cost Millions]. Na kolei (in Polish). Retrieved 2025-06-09.
- ^ Szymajda, Michał (10 October 2018). "Dolnośląski Samorząd Ponownie Deklaruje Przejęcie Nieużywanych Linii Kolejowych" [Lower Silesian Local Government Again Declares Intent to Take Over Unused Railway Lines]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "Dolnośląska Służba Dróg i Kolei" [Lower Silesian Roads and Railways Service]. dsdik.wroc.pl (in Polish). 24 December 2022. Archived from the original on 2021-05-17.
- ^ a b c d Rösler, Jakub (15 September 2023). "Dolny Śląsk Oficjalnie Zarządza Już Liniami do Lwówka i Stronia Śląskiego" [Lower Silesia Officially Manages Lines to Lwówek and Stronie Śląskie]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ Mierzwiak, Iwona (13 November 2023). "Województwo Przejmuje Kolejną, Starą Linię Kolejową Przemków Wróci na Kolejową Mapę Dolnego Śląska" [Voivodeship Takes Over Another Old Railway Line, Przemków Returns to Lower Silesia's Railway Map]. miedziowe.pl (in Polish). Retrieved 2025-06-09.
- ^ Gadomska, Paulina (30 April 2022). "Kolej Pojedzie z Jeleniej Góry do Mysłakowic. Plac pod Budowę Został Już Przekazany" [Trains Will Run from Jelenia Góra to Mysłakowice. The Construction Site Has Been Handed Over]. Jelenia Góra Nasze Miasto (in Polish). Retrieved 2025-06-09.
- ^ a b "Wykonanie Robót Budowlanych dla Zadania pn: "Rewitalizacja Linii Kolejowej nr 310 Kobierzyce – Piława Górna na Odcinku Łagiewniki Dzierżoniowskie – Piława Górna – II Etap" [Construction Works for the Project: "Revitalization of Railway Line No. 310 Kobierzyce – Piława Górna, Łagiewniki Dzierżoniowskie – Piława Górna Section – Stage II"]. dsdik-wroc.logintrade.net (in Polish). Archived from the original on 2022-12-09.
- ^ Rösler, Jakub (21 November 2023). "Do Świeradowa w 21 Minut. Znamy Rozkład Jazdy!" [To Świeradów in 21 Minutes. We Know the Timetable!]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ a b Rösler, Jakub (2 April 2024). "Bielawa Będzie Miała Niemalże Kolej Miejską" [Bielawa Will Have Almost an Urban Railway]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ a b "Trwają Prace na Linii Kolejowej do Karpacza" [Works Ongoing on the Railway Line to Karpacz]. Karkonosze Go (in Polish). 17 March 2023. Retrieved 2025-06-09.
- ^ "Podgląd Zapytania" [Preview of the Inquiry]. logintrade.net (in Polish). Archived from the original on 2023-12-11.
- ^ a b "Linia Kolejowa 303 (PL) • Rokitki - Kożuchów" [Railway Line 303 (PL) • Rokitki - Kożuchów]. atlaskolejowy.net (in Polish). Retrieved 2025-06-09.
- ^ a b Kanikowski, Piotr (27 February 2019). "Marszałek Przejmuje od PKP Nieczynne Linie Kolejowe" [Marshal Takes Over Inactive Railway Lines from PKP]. 24legnica.pl (in Polish). Retrieved 2025-06-09.
- ^ Szymajda, Michał (17 December 2020). "Dolny Śląsk Formalnie Właścicielem Części Linii 303" [Lower Silesia Formally Owns Part of Line 303]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ Kalinowski, Piotr (3 August 2021). "Kolej Wróci do Chocianowa. Rewitalizują Linię nr 303" [Railway Returns to Chocianów. Revitalizing Line No. 303]. Radio Wrocław (in Polish). Retrieved 2025-06-09.
- ^ Rösler, Jakub (6 December 2022). "Chocianów. Pierwszy Pociąg po 22 Latach Wjechał na Stację" [Chocianów. First Train in 22 Years Arrived at the Station]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "Trwa Rewitalizacja Kolejnej Linii Kolejowej na Dolnym Śląsku" [Ongoing Revitalization of Another Railway Line in Lower Silesia]. investmap.pl (in Polish). 28 March 2024. Retrieved 2025-06-09.
- ^ Rösler, Jakub (20 March 2024). "Dolny Śląsk Rewitalizuje Linię do Przemkowa" [Lower Silesia Revitalizes the Line to Przemków]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "Zaprojektowanie i Wykonanie Robót Budowlanych dla Zadania pn.: Rewitalizacja Linii Kolejowej nr 303 Rokitki – Kożuchów na Odcinku Chocianów – Przemków Odlewnia od km 10,970 do km 28,290" [Design and Construction Works for the Project: Revitalization of Railway Line No. 303 Rokitki – Kożuchów, Chocianów – Przemków Odlewnia Section from km 10.970 to km 28.290]. EZamówienia (in Polish). 14 March 2025. Retrieved 2025-06-09.
- ^ a b Perzanowski, Michał (19 December 2022). "Przetarg na Odbudowę Linii Kolejowej Kobierzyce – Piława Górna. Ostatnio Pociągi Jeździły Tam w 1996 Roku" [Tender for the Reconstruction of the Kobierzyce – Piława Górna Railway Line. Trains Last Ran There in 1996]. Gazeta Wrocławska (in Polish). Retrieved 2025-06-09.
- ^ Szymajda, Michał (26 March 2024). "Pociąg z Wrocławia przez Kobierzyce do Piławy Ruszą w Końcu 2025 Roku" [Trains from Wrocław via Kobierzyce to Piława Will Finally Start in 2025]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ Etmanowicz, Andrzej (1990). "Koleje Elektryczne Dolnego Śląska po Przejęciu przez PKP w 1945 Roku" [Electric Railways of Lower Silesia After Acquisition by PKP in 1945]. Parowozik (in Polish). 4. Poznań: Poznański Klub Modelarzy Kolejowych: 6–7, 15. Archived from the original on 8 July 2013.
- ^ "Linia Kolejowa 311 (PL) • Jelenia Góra - Jakuszyce gr. p. [PL/CZ]" [Railway Line 311 (PL) • Jelenia Góra - Jakuszyce State Border [PL/CZ]]. Atlas Kolejowy Europy Środkowej (in Polish). Retrieved 2025-06-09.
- ^ "Pociągiem do Harrachova – Ruszają Prace Rewitalizacji Linii Kolejowej" [To Harrachov by Train – Revitalization Works on the Railway Line Begin]. szklarskaporeba.pl (in Polish). Archived from the original on 2014-02-02.
- ^ "Rekonstrukce Trati Szklarska Poręba – Harrachov" [Reconstruction of the Szklarska Poręba – Harrachov Line]. zubacka.cz (in Czech). 11 June 2009. Archived from the original on 2012-10-29.
- ^ "Kolei Izerska – Rozkład Jazdy" [Izera Railway – Timetable]. szklarska-gazeta.pl (in Polish). Archived from the original on 2014-02-02.
- ^ "Linia 316 Złotoryja-Rokitki" [Line 316 Złotoryja-Rokitki]. jelenia.rail.pl (in Polish). Retrieved 2025-06-09.
- ^ Kanikowski, Piotr (20 March 2014). "Kolej Rozbiera Linie i Oddaje Gminom na Ścieżki Rowerowe" [Railway Dismantles Lines and Transfers Them to Municipalities for Bike Paths]. 24legnica.pl (in Polish). Retrieved 2025-06-09.
- ^ Madrjas, Jakub (6 May 2021). "Jest Przetarg DSDiK na Rewitalizację Linii 316 Chojnów – Rokitki" [DSDiK Issues Tender for Revitalization of Line 316 Chojnów – Rokitki]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "Prace PLK SA za Ponad 24 Mln zł dla Sprawnej Sieci Kolejowej na Dolnym Śląsku" [PLK SA Works Worth Over 24 Million PLN for an Efficient Railway Network in Lower Silesia]. plk-sa.pl (in Polish). 6 December 2022. Retrieved 2025-06-09.
- ^ Stankiewicz, Ryszard; Stiasny, Marcin (2010). Atlas Linii Kolejowych Polski 2010 [Atlas of Polish Railway Lines 2010] (in Polish). Rybnik: Eurosprinter. ISBN 978-83-926946-8-7.
- ^ Czubiński, Roman (7 April 2024). "Kolej Wróci do Świeradowa. Jest Przetarg na Rewitalizację" [Railway Returns to Świeradów. Tender Issued for Revitalization]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ a b "Czy Ktoś Jeździ Pociągiem do Świeradowa-Zdroju?" [Does Anyone Ride the Train to Świeradów-Zdrój?]. lwowecki.info (in Polish). 14 March 2024. Retrieved 2025-06-09.
- ^ "Linia Kolejowa 322 (PL) • Kłodzko Nowe - Stronie Śląskie [PL/CZ]" [Railway Line 322 (PL) • Kłodzko Nowe - Stronie Śląskie [PL/CZ]]. Atlas Kolejowy Europy Środkowej (in Polish). Retrieved 2025-06-09.
- ^ "Problemy z Uruchomieniem Linii Kolejowej do Lądka i Stronia Zostaną Rozwiązane?" [Will the Problems with Launching the Railway Line to Lądek and Stronie Be Resolved?]. 24kłodzko.pl (in Polish). 16 May 2022. Retrieved 2025-06-09.
- ^ Rösler, Jakub (20 October 2022). "Pojechaliśmy do Lądka-Zdroju Pociągo-Autobusem KD" [We Traveled to Lądek-Zdrój by KD Train-Bus]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ Rösler, Jakub (5 September 2024). "Dolny Śląsk: Pociągi do Stronia Śląskiego Pojadą w 2026 Roku" [Lower Silesia: Trains to Stronie Śląskie Will Run in 2026]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "60200-2025 - Procedura Konkurencyjna" [60200-2025 - Competitive Procedure]. ted.europa.eu (in Polish). 29 January 2025. Retrieved 2025-06-09.
- ^ Gołaszewski, Janusz (2005). "Historia Kolei. Dzieje Linii Kolejowej Wrocław Psie Pole - Trzebnica" [History of Railways. The Story of the Wrocław Psie Pole - Trzebnica Railway Line]. Świat Kolei (in Polish). 8. Łódź: Emi-press: 14–25. ISSN 1234-5962.
- ^ "Pierwszy Przejazd Szynobusu z Wrocławia do Trzebnicy" [First Railbus Journey from Wrocław to Trzebnica]. dsdik.wroc.pl (in Polish). 22 September 2009. Archived from the original on 2013-12-26.
- ^ Szymajda, Michał (5 April 2024). "Czy Koleje Dolnośląskie Dojadą do Poznania, Opola albo Brzegu?" [Will Koleje Dolnośląskie Reach Poznań, Opole, or Brzeg?]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ a b Kokoszkiewicz, Mateusz (2 January 2023). "Po 20 Latach Pociągi Powrócą do Karpacza" [After 20 Years, Trains Will Return to Karpacz]. Gazeta Wyborcza (in Polish). Retrieved 2025-06-09.
- ^ "Rewitalizacja Linii Kolejowej nr 340 Mysłakowice – Karpacz od km -0,247 do km 7,055. Przygotowanie Placu pod Rewitalizację" [Revitalization of Railway Line No. 340 Mysłakowice – Karpacz from km -0.247 to km 7.055. Preparation of the Construction Site]. Dolnośląska Służba Dróg i Kolei we Wrocławiu (in Polish). Archived from the original on 2022-12-15.
- ^ Rösler, Jakub (20 January 2023). "11 Ofert na Wstępną Rewitalizację Linii do Karpacza" [11 Bids for Preliminary Revitalization of the Line to Karpacz]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "Linia Bielawa Zachodnia – Dzierżoniów Śląski (341)" [Line Bielawa Zachodnia – Dzierżoniów Śląski (341)]. Baza Kolejowa (in Polish). Retrieved 2025-06-09.
- ^ a b "Rusza Rewitalizacja Linii Kolejowej Bielawa – Dzierżoniów. Pociągi Wrócą we Wrześniu" [Revitalization of the Bielawa – Dzierżoniów Railway Line Begins. Trains Will Return in September]. Rynek Kolejowy (in Polish). 23 March 2019. Retrieved 2025-06-09.
- ^ Szarafin, Bartosz (22 March 2019). "15 Milionów Złotych na Rewitalizację Odcinka Linii Kolejowej z Dzierżoniowa do Bielawy" [15 Million PLN for Revitalization of the Dzierżoniów to Bielawa Railway Section]. Radio Wrocław (in Polish). Retrieved 2025-06-09.
- ^ a b Fiszer, Kasper (16 December 2019). "Bielawa: Tłumy Ludzi w Pociągach. Tory Zablokowane przez Protestujących" [Bielawa: Crowds in Trains. Tracks Blocked by Protesters]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ Kruk, Marcin (21 October 2019). "Pociąg z Bielawy do Wrocławia od Grudnia. Trwają Odbiory Linii Kolejowej" [Train from Bielawa to Wrocław from December. Railway Line Inspections Ongoing]. Gazeta Wrocławska (in Polish). Retrieved 2025-06-09.
- ^ Szymajda, Michał (31 May 2021). "Dolnośląski Samorząd Chce Odbudować Linię do Srebrnej Góry. Jest Przetarg" [Lower Silesian Local Government Wants to Rebuild the Line to Srebrna Góra. Tender Issued]. Rynek Kolejowy (in Polish). Retrieved 2025-06-09.
- ^ "Po 40 Latach Pociągi Znów Pojadą Obok Jeziora Bielawskiego. Rozpoczęto Rozbudowę Linii w Kierunku Gór Sowich" [After 40 Years, Trains Will Run Again by Lake Bielawskie. Expansion Started Toward the Owl Mountains]. Radio Wrocław (in Polish). 27 January 2025. Retrieved 2025-06-09.
- ^ "Zaprojektowanie i Wykonanie Robót Budowlanych dla Zadania pn.: Rewitalizacja Linii Kolejowej nr 318 Relacji Srebrna Góra-Bielawa Zachodnia od km 12,380 do km 24,300" [Design and Construction Works for the Project: Revitalization of Railway Line No. 318 Srebrna Góra-Bielawa Zachodnia from km 12.380 to km 24.300]. ezamowienia.gov.pl (in Polish). 27 January 2025. Retrieved 2025-06-09.